Filter Your Results

91.010.40-20 Cost of pre-project and project materials

Sort By:
Products per page:
Viewing Page 1 of 12
Collection
Collection of estimated time norms for testing oil, gas, gas condensate, hydrogeological objects in exploration, reference, parametric, prospecting wells and development of objects in production wells
Letter 01-01-17/10312-SB
On determining the estimated cost at the stage of architectural and structural design
Letter 01-01-17/13107-SL
On determining the estimated cost of construction at the stage of architectural and construction design
Letter 12-19
About copyright supervision
Manual
Manual for impulse and low consumption fire extinguishing systems
Price: $1,373.00
MDS 81-11.2000
Recommended Practice for the Determination of Costs Associated with Contractor Bidding in the Russian Federation
Price: $375.00
MDS 81-15.2000
Recommended Practice for Scope and Accounting of Costs Included in Unit Cost of Design and Survey Products (Work, Services) for Construction and Generation of Financial Results
Price: $295.00
MRR 1.1-16
General Guidelines for the Application of Moscow Regional Recommendations
MRR 1.2.02-18
Methodology for calculating conversion factors (inflationary changes) of the base cost of urban planning, design and other types of work (services) in the design
MRR 1.2.03-19
The methodology for calculating conversion factors (inflationary changes) of the base cost of urban planning, design and other types of work (services) in the design
MRR 1.2-17
The methodology for calculating the allocation factors (inflationary changes) of the base cost of urban planning, design and other types of work (services) in the design
MRR 10.1-17
Author's supervision
Price: $247.00
Viewing Page 1 of 12

All Codes and Regulations

All Categories

Send us a message Expand Collapse

Leave your message in the form below, and we will write back by e-mail!