Collection of estimated time norms for testing oil, gas, gas condensate, hydrogeological objects in exploration, reference, parametric, prospecting wells and development of objects in production wells
|
On determining the estimated cost at the stage of architectural and structural design
|
On determining the estimated cost of construction at the stage of architectural and construction design
|
About copyright supervision
|
Manual for impulse and low consumption fire extinguishing systems
|
Recommended Practice for the Determination of Costs Associated with Contractor Bidding in the Russian Federation
|
Recommended Practice for Scope and Accounting of Costs Included in Unit Cost of Design and Survey Products (Work, Services) for Construction and Generation of Financial Results
|
General Guidelines for the Application of Moscow Regional Recommendations
|
Methodology for calculating conversion factors (inflationary changes) of the base cost of urban planning, design and other types of work (services) in the design
|
The methodology for calculating conversion factors (inflationary changes) of the base cost of urban planning, design and other types of work (services) in the design
|
The methodology for calculating the allocation factors (inflationary changes) of the base cost of urban planning, design and other types of work (services) in the design
|
|