Filter Your Results
Search results:

T56 Construction Documentation System

Sort By:
Products per page:
Viewing Page 1 of 2
Page:12>>>
GOST 22845-77
Passenger, Freight, and Medical Service Elevators. Regulations for execution and acceptance of works
GOST 22845-85
Electrical passenger and freight elevators
Price: $349.00
OST 34-43-773-85
Organization of assembly works in nuclear thermal power plants with water-cooled power reactors. Assembly of electrical equipment. General requirements.
OST 34-43-774-85
Organization of assembly works in nuclear thermal power plants. Assembly of cable electric power lines. General requirements.
OST 34-43-775-86
Organization of assembly works in nuclear thermal power plants. Technical documentation regarding assembly of electrical equipment, cable electric power lines, automation equipment and control systems. Requirements for documentation on operational management and quality control of installation and wiring works.
OST 34-43-776-86
Organization of assembly works in nuclear thermal power plants. Technical documentation regarding assembly of electrical equipment, cable electric power lines, automation equipment and control systems. Requirements for preproduction documentation.
OST 34-43-777-86
Organization of assembly works in nuclear thermal power plants. Technical documentation regarding assembly of electrical equipment, cable electric power lines, automation equipment and control systems. Requirements for initial check quality documentation.
OST 34-43-778-85
Organization of assembly works in nuclear thermal power plants with water-cooled power reactors. Assembly of automation equipment and control systems. General requirements.
OST 34-43-779-85
Organization of assembly works in nuclear thermal power plants. Assembly of electrical equipment, cable electric power lines, automation equipment and control systems. Main provisions.
OST 34-43-780-86
Organization of assembly works in nuclear thermal power plants. Technical documentation regarding assembly of electrical equipment, cable electric power lines, automation equipment and control systems. Main provisions.
OST 36-134-86
Installation of industrial ventilation and air conditioning systems. Workflow project. Procedure of development, structure and content.
Price: $213.00
OST 4-091.152-80
System of branch specialization. Design assignment of the industrial enterprises, productions, research institutes, design offices and objects.
Viewing Page 1 of 2
Page:12>>>

All Codes and Regulations

All Categories

Send us a message Expand Collapse

Leave your message in the form below, and we will write back by e-mail!