Power units with T-180 turbines /^ 210-130 and K-215-130 and drum boilers. Typical starting schemes
|
Recommended Practice for Optimizing Startup/Shutdown Modes of Boilers of Modular Units and Interconnected Thermal Power Stations
|
Power Units with Turbines T-180/210-310 and K-215-130 and Drum Boilers -Standard Startup Process
|
Cogeneration monobloc unit with turbine T-110/120-130 and drum boiler. Typical starting connection
|
Two-Boiler, Single-Turbine Unit with Turbine T-185/220-130 and Drum Boilers. Standard Startup Process
|
Technical Requirements for Maneuverability of Half-Peak Power Units of Thermal Power Stations with Condensation Turbines
|
Typical start-up scheme for a 300 MW monoblock
|
Typical start-up diagram of a 300 MW double-unit
|
Technical Requirements for Maneuverability of Energy Blocks of Thermal Power Plants with Condensing Turbines
|
Interim Guidelines for Acceptance of Thermal Insulation of Power Units After Installation
|
Model Guidelines for Startup from Various Thermal States and Shutdown of Two-Boiler, Single-Turbine Unit with Power of 300 MW with Turbine K-300-240 LMZ by Motor Unit Scheme
|
Typical instructions for start-up from various thermal states and shutdown of a 300 MW double unit
|