Filter Your Results
Search results:

25. Power units main equipment

Sort By:
Products per page:
Viewing Page 1 of 3
Page:123>>>
RD 153-34.1-25.101-00
Power units with T-180 turbines /^ 210-130 and K-215-130 and drum boilers. Typical starting schemes
RD 153-34.1-25.515-98
Recommended Practice for Optimizing Startup/Shutdown Modes of Boilers of Modular Units and Interconnected Thermal Power Stations
Price: $289.08
RD 34.25.101-87
Power Units with Turbines T-180/210-310 and K-215-130 and Drum Boilers -Standard Startup Process
RD 34.25.102-87
Cogeneration monobloc unit with turbine T-110/120-130 and drum boiler. Typical starting connection
Price: $273.24
RD 34.25.103-87
Two-Boiler, Single-Turbine Unit with Turbine T-185/220-130 and Drum Boilers. Standard Startup Process
RD 34.25.104-93
Technical Requirements for Maneuverability of Half-Peak Power Units of Thermal Power Stations with Condensation Turbines
Price: $147.51
RD 34.25.105
Typical start-up scheme for a 300 MW monoblock
RD 34.25.106
Typical start-up diagram of a 300 MW double-unit
RD 34.25.107
Technical Requirements for Maneuverability of Energy Blocks of Thermal Power Plants with Condensing Turbines
RD 34.25.401
Interim Guidelines for Acceptance of Thermal Insulation of Power Units After Installation
Price: $211.86
RD 34.25.501
Model Guidelines for Startup from Various Thermal States and Shutdown of Two-Boiler, Single-Turbine Unit with Power of 300 MW with Turbine K-300-240 LMZ by Motor Unit Scheme
Price: $772.20
RD 34.25.502
Typical instructions for start-up from various thermal states and shutdown of a 300 MW double unit
Viewing Page 1 of 3
Page:123>>>

All Codes and Regulations

All Categories

Send us a message Expand Collapse