Album 0 Binding materials and drawings of the zero cycle of works
|
Album 1 Architectural, structural and technological drawings
|
Tab. 2 Sanitary, electrical engineering drawings, communication and signaling, automation of sanitary installations
|
Album 3 Factory-made products
|
Tab. 4 Automation of plumbing devices, the task of the factory for the manufacture of shields
|
Equipment specifications in Appendix 5
|
Appendix 6 Statement of material requirements
|
|
|
Sports and recreation complex for urban settlements and villages. The building is two-storey. Walls made of brick. Volume 11 052 m3.
|
|
|