Urban polyclinic for 1000 visits per shift in the structures of II-04. Algorithm 1 Materials for binding. Architectural and structural part below the level of 0,000
|
City polyclinic for 1000 visits per shift in the structures of II-04. Album 2 Architectural and construction part above the level 0,000.
|
City polyclinic for 1000 visits per shift in the structures of II-04. Album 3 Heating and ventilation. Water supply and sewerage
|
Urban polyclinic for 1000 visits per shift in the structures of II-04. Tab. 4 Technological equipment. Therapeutic gas supply
|
City polyclinic for 1000 visits per shift in the structures of II-04. Album 5 Electrical equipment
|
City polyclinic for 1000 visits per shift in the structures of II-04. Album 6 Automation. Communication and alarm devices
|
Urban polyclinic for 1000 visits per shift in the structures of II-04. Alb. 11 Variant of the project with utility rooms in the basement
|
Urban polyclinic for 1000 visits per shift in the structures of II-04. Alb. 12 Design documentation for the conversion of the utility rooms in the basement for use under the PRU.
|
Urban polyclinic for 1000 visits per shift in the structures of II-04. Album 8 Nodes of general structural and architectural solutions. Sanitary units
|
City polyclinic for 1000 visits per shift in the II-04 structures
|
Infectious diseases building for 50 beds of the district hospital for 400 beds with a polyclinic for 600 visits per shift. The building is two-storey. Walls made of brick. Volume 11,221 m3
|
Infectious diseases building for 50 beds of the district hospital for 400 beds with a polyclinic for 600 visits per shift. The building is two-storey. The walls are made of brick. Volume 11,221 sq.m. Exhibit 1 Architectural and structural part below 0.000 level. The architectural and structural part above the height of 0.000
|