Submission of bricks to the workplace of a bricklayer (200 pcs per lift)
|
Submission of bricks to the workplace of a bricklayer (400 pcs per lift)
|
Delivery of the solution in bins to the work of bricklayers with preliminary mixing
|
Submission to the forests of silicate brick in bags without pallets
|
Reception, mixing and dispensing solution using an inventory installation
|
Installation of steel order
|
Installation of door blocks in the openings of brick walls
|
Delivery of the solution in tubs to the workplace with mixing it
|
Delivery of the solution in tubs to the workplace (without mixing)
|
Installation of balcony plates
|
Installation of staircases
|
Installation of flight of stairs
|