Home
Translation
Regulatory
Distributors
Terms
About Us
Contact
More Search Options testing
Login
My Account
Shopping Cart (0)
Your shopping cart is empty.
0
saved
Now In:
Other norms
Documents by Year
1930s (70)
1930 (5)
1931 (6)
1932 (9)
1933 (6)
1934 (6)
1935 (4)
1936 (12)
1937 (7)
1938 (3)
1939 (12)
1940s (34)
1940 (4)
1941 (4)
1942 (3)
1943 (5)
1944 (2)
1945 (1)
1946 (7)
1947 (6)
1948 (1)
1949 (1)
1950s (98)
1951 (5)
1952 (6)
1953 (18)
1954 (11)
1955 (20)
1956 (21)
1957 (2)
1958 (3)
1959 (12)
1960s (256)
1960 (7)
1961 (35)
1962 (38)
1963 (48)
1964 (13)
1965 (11)
1966 (18)
1967 (21)
1968 (35)
1969 (30)
1970s (224)
1970 (18)
1971 (13)
1972 (8)
1973 (7)
1974 (30)
1975 (40)
1976 (37)
1977 (23)
1978 (18)
1979 (30)
1980s (1012)
1980 (36)
1981 (53)
1982 (44)
1983 (119)
1984 (110)
1985 (128)
1986 (135)
1987 (206)
1988 (86)
1989 (95)
1990s (1015)
1990 (132)
1991 (210)
1992 (47)
1993 (84)
1994 (56)
1995 (38)
1996 (32)
1997 (41)
1998 (102)
1999 (273)
2000s (10448)
2000 (386)
2001 (2234)
2002 (533)
2003 (610)
2004 (580)
2005 (864)
2006 (1117)
2007 (1264)
2008 (1329)
2009 (1531)
2010s (18443)
2010 (1832)
2011 (2516)
2012 (2418)
2013 (3266)
2014 (2706)
2015 (3330)
2016 (1659)
2017 (249)
2018 (219)
2019 (248)
2020s (360)
2020 (360)
Other (1876)
Other norms
1986
«
1
2
3
»
Exemplary project 901-4-97s.86
Rectangular prefabricated reinforced concrete water tanks with a capacity of 1400 to 2400 cubic meters. m for seismic areas (with the use of industrial products). Album 1 Explanatory note. Materials for the design of tanks with a capacity of 50-5000 cubic meters. m. Indicators of the results of the application of scientific and technical achievements in the construction solutions of the project (from TP 901-4-99s.86)
Exemplary project 901-4-97s.86
Rectangular prefabricated reinforced concrete water tanks with a capacity of 1400 to 2400 cubic meters. m for seismic areas (with the use of industrial products). Album 2 Reinforced concrete structures
Exemplary project 901-4-97s.86
Rectangular prefabricated reinforced concrete water tanks with a capacity of 1400 to 2400 cubic meters. m for seismic areas (with the use of industrial products). Album 3 Construction products of tanks with a capacity of 1400-5000 cubic meters. m (from TP 901-4-99s.86)
Exemplary project 901-4-97s.86
Rectangular prefabricated reinforced concrete water tanks with a capacity of 1400 to 2400 cubic meters. m for seismic areas (with the use of industrial products). Album 4 Estimates
Exemplary project 901-4-97s.86
Rectangular prefabricated reinforced concrete water tanks with a capacity of 1400 to 2400 cubic meters. m for seismic areas (with the use of industrial products). Album 5 List of material requirements. Materials for design
Exemplary project 901-4-97s.86
Rectangular prefabricated reinforced concrete water tanks with a capacity of 1400 to 2400 cubic meters. m for seismic areas (with the use of industrial products). Album 6 Process piping and signaling for tanks with a capacity of 50-20000 cubic meters. m (from TP 901-4-63.83)
Exemplary project 901-4-97s.86
Rectangular prefabricated reinforced concrete water tanks with a capacity of 1400 to 2400 cubic meters. m for seismic areas (using industrial building products)
GK 4137-86
Hygienic classification of labor (in terms of the hazards and hazards of the factors of the working environment, the severity and intensity of the labor process)
GKINP 02-049-86
Symbols for topographic plans on scales of 1:5000, 1:2000, 1:1000, 1:500
GSSSD 100-86
Tables of standard reference data. Cyclohexane. Thermodynamic properties at temperatures of 280 ... 680 K and pressures of 0.1 ... 70 MPa
GSSSD 97-86
Tables of Standard Reference Data. Carbon dioxide-nitrogen. Thermodynamic properties of gas mixtures in the temperature range 273 to 1000 K and the pressure range 0, 1 to 15 MPa
Price:
$560.00
GSSSD 98-86
Tables of standard reference data. Water. Specific volume and enthalpy at temperatures of 0 ... 800 degrees Celsius and pressures of 0.001 ... 1000 MPa
Guidelines 4077-86
Methodological instructions on sanitary-hygienic evaluation of rubber and latex medical devices
Model project 232-1-138.86
Album 1 Part 2 Architectural and construction drawings
Model project 232-1-138.86
Album 1 Part 3 Technological drawings
Model project 232-1-138.86
Album 3 Part 2 Electrical Drawings
Model project 232-1-138.86
Album 6 Part 2 Equipment specification. Sanitary equipment
Model project 232-1-138.86
Album 6 Part 3 Equipment specification. Electrical equipment
Model project 232-1-138.86
Album 8 Part 2 Estimates
Model project 232-1-138.86
Album 8 Part 3 Estimates
Model project 232-1-138.86
Album 1 Part 1 Architectural and construction drawings
Model project 232-1-138.86
Album 2 Plumbing Drawings
Model project 232-1-138.86
Album 3 Part 1 Electrical Drawings
Model project 232-1-138.86
Album 5 Drawings-orders for the manufacturer
Model project 232-1-138.86
Album 6 Part 1 Equipment specification. Technological equipment
Model project 232-1-138.86
Album 7 Material Requirements Sheets
Model project 232-1-138.86
Album 8 Part 1 Estimates
Model project 232-1-138.86
Album 9 Design documentation for the transfer of the basement room to the PRU mode
Model project 801-4-105.86
Album 1. Explanatory note. Production technology. Architectural and construction part. Heating and ventilation. Internal water supply and sewerage. Electrical part
Model project 801-4-105.86
Album 2. Hardware Specifications
Model project 801-4-105.86
Album 3. Estimates
Model project 801-4-105.86
Album 4. Statement of Material Requirements
Model project 801-4-105.86
Building for 250 heads of young cattle of tethered content (walls - brick pillars with log tidying, floors - wooden)
Model project 801-4-105.86
Album 1. Explanatory note. Production technology. Architectural and construction part. Heating and ventilation. Internal water supply and sewerage. Electrical part
Model project 801-4-105.86
Album 2. Hardware Specifications
Model project 801-4-105.86
Album 3. Estimates
Model project 801-4-105.86
Album 4. Statement of Material Requirements
Model project 801-4-105.86
Building for 250 heads of young cattle of tethered content (walls - brick pillars with log tidying, floors - wooden)
Model project 816-1-75.86
Album 1. General explanatory note. Production technology. Architectural solutions. Reinforced concrete structures. Metal structures. Internal water supply and sewerage. Heating and ventilation. Power equipment. Heating and ventilation automation. Communication and signaling
Model project 816-1-75.86
Album 2. Building products
Model project 816-1-75.86
Album 4. Hardware Specifications
Model project 816-1-75.86
Album 5. Non-standardized equipment (from TP 816-1-79.86)
Model project 816-1-75.86
Album 6. Material Requirements Sheets
Model project 816-1-75.86
Album 7. Estimates
Model project 902-5-24.86
Pump station for digesters with a volume of 2500 cubic meters. m
Model project 902-5-24.86
Album I. Technological, architectural, constructive, sanitary-technical solutions
Model project 902-5-24.86
Album II. Electrical solutions, automation, technological control. Assembly area drawings
Model project 902-5-24.86
Album III. The task to the manufacturer on the control and alarm panel - SCHUS
«
1
2
3
»
All Codes and Regulations
Codes
MGSN
OND
PR
SNiP
TU
Decisions
MI
ONTP
PUE
SN
VNTP
Decrees
MR
Orders
RD
SO
VPPB
GN
MSN
OST
RDS
SP
VRD
GOST
MSP
Other norms
Resolutions
ST SEV
VSN
Instructions
MUK
PB
RMU
STO
Laws
MU
PNAE
R
TI
Letters
ND
PND
RSN
TOI
MDK
NPB
POT
RTM
TR EAES
MDS
NP
PPB
SanPiN
TSN
All Categories
Construction (Max)
Highways (Max)
National Standards for KGS (State Standards Classification)
Power industry
Standards for pipe fittings (TPA)
Construction Price Formation
ISO classifier
National Standards for OKSTU
Projects of works (PPR) on bridges
Technical Supervision
Evidence base (TR CU, Technical Regulation of the Customs Union)
National standards
Organization Standards
PromExpert
Welding regulations
Send us a message
Leave your message in the form below, and we will write back by e-mail!
Please enter your message!
Please enter your email!
Please enter valid email!
Please enter captcha!
Invalid captcha!