Name |
Summary |
SKU |
RD 153-34.1-35.523-2002 |
Methodical instructions for rational application of control & monitoring hardware on tpp boiler-and-turbine equipment, with installed tp acs
|
RUSS17782 |
POT RM 016-2001/ RD 153-34.0-03.150-00 (2.20) Izmenenija i dopoln.k POT RM 016-2001/ RD 153-34.0-03.150-00 (2.20.1) |
Rules on labor protection in the operation of electrical installations Changes and additions to POT RM 016-2001/RD 153-34.0-03.150-00
|
RUSS162678 |
RD 153-34.1-35.649-00 |
Methodical instructions for the maintenance and repair of instruments for monitoring the movement of elements of a turbine of an type of production manufactured by NPO Eleksir (Rostov-on-Don)
|
RUSS164136 |
RD 153-34.1-35.144-2002 |
Recommendations for the use of TPP modern universal coding system and control systems. Basic provisions.
|
RUSS21031 |
RD 153-34.1-35.501-00 |
Model Guidelines for Operation of Monitoring and Control Systems for Thermal Energy Equipment of Thermal Power Stations [for Personnel of Thermal Energy and Automation Shop (Automated Process Control Systems Shop]
|
RUSS147021 |
RD 153-34.1-35.142-00 |
Procedural Guidelines for Operation of Microprocessor-Based Process Protective Means
|
RUSS148451 |
RD 153-34.1-35.114-00 |
Scope and Technical Specifications for Design of Process Protective Means for Thermal Energy Equipment of Modular Units with Once-Through Boilers (for Equipment Designed Prior to1997)
|
RUSS149841 |
RD 153-34.1-35.115-2001 |
Scope and Technical Specifications for Design of Process Protective Means for Thermal Energy Equipment of Modular Units with Drum Boilers (for Equipment Designed Prior to 1997)
|
RUSS149840 |
RD 153-34.1-35.116-2001 |
Scope and Technical Specifications for Design of Process Protective Means for Thermal Energy Equipment of Interconnected Electric Power Generating Stations and Hot Water Boilers
|
RUSS149839 |
RD 153-34.1-35.104-2001 |
Guidelines on the scope of process measurements, alarm system, automatic regulation at thermal power plants with ccgt unit equipped with an automated process control system
|
RUSS17917 |
RD 153-34.1-35.145-2003 |
Technical requirements for the function of the P & C of the automated process control system of TPP "Collection and primary processing of information"
|
RUSS164133 |
RD 153-34.1-35.136-98 |
Procedural guidelines for the preparartion of thermal power plant heat and power equipment process protection circuits
|
RUSS20115 |
RD 153-34.1-35.522-98 |
Guidelines for Operation of Automated Process Control Systems of Thermal Energy Equipment of Thermal Power Stations
|
RUSS145167 |
RD 153-34.1-35.418-2002 |
Guidelines for setting up a system for regulating the process of burning gas-oil boilers
|
RUSS164135 |
RD 153-34.1-35.417-2001 |
Guidelines for setting up automatic regulators of turbine equipment of TPPs
|
RUSS164134 |
RD 153-34.1-35.105-2002 |
Guidelines for equipping with technological means of technological protection with increasing turbine vibration
|
RUSS164132 |
RD 153-34.1-35.521-00 |
Scope and Maintenance of Operational Documents for Automated Process Control Systems (Thermal Energy and Automation Systems) of Thermal Power Stations
|
RUSS149836 |
RD 153-34.1-35.143-00 |
Scope and specifications for the implementation of process safeguards on heat and power equipment of gas turbine power plants (TPP)
|
RUSS20381 |
SO 153-34.02.316-2003 (RD 153-34.1-02.316-2003) |
Method of calculating emissions of benz (a ) pyrene in atmosphere by steam boilers of power plants.
|
RUSS126579 |
RD 153-34.1-35.138-00 |
Technical Specifications for Design of Process Protective Means and Interlocks in Compliance with the "Safety Requirements for Gas Supply Systems" for Boilers on which Gas Units Manufactured by AMMAKS ZAO are Installed n the Gas Supply Lines to the Burner
|
RUSS150806 |
RD 153-34.1-35.503-00 |
Procedural Guidelines for Adjustment of Process Protective Means for Thermal Energy Equipment of Thermal Power Stations
|
RUSS148274 |
RD 153-34.1-35.127-2002 |
General technical requirements for program and technical complex for technological process automated control system of thermal power plant
|
RUSS19496 |
RD 153-34.1-35.141-00 |
Scope and Technical Specifications for Design of Process Protective Means and Interlocks of Gas Regulator Stations
|
RUSS149838 |
RD 153-34.1-35.108-2001 |
Technical Specifications for Design of Process Protective Means and Interlocks When Using Fuel Oil and Natural Gas in Boiler Plants in Compliance with Explosion Safety Requirements
|
RUSS150807 |
RD 153-34.1-35.137-00 |
Technical requirements for microprocessor technology based process protection subsystem
|
RUSS18451 |
OST 153-34.0-1002-99A |
Assembly units and suspension parts for nuclear power plant station pipelines Py <= 4.0 MPa (40 kgf/cm2). Gasket Design and dimensions
|
RUSS300645 |
OST 153-34.0-1002-99А |
Assembling units and station pipeline hang details of nuclear power plants. Nominal pressure is no more than 4,0 MPa. The laying. Design and dimensions.
|
RUSS99577 |
RD 153-34.1-20.528-2001 |
Recommended Practice and Example of Calculation of Energy Characteristics of Piped Hot Water Heat Supply Networks According to System Water Losses Indicator
|
RUSS149038 |
SO 153-34.26.608-2003 |
Instructions for inspection and repair technology for high-pressure boiler drums
|
RUSS168870 |
SO 153-34.21.363-2003 |
Guidelines for the inspection of industrial buildings and structures of thermal power plants to be reconstructed
|
RUSS168868 |
SO 153-34.17.471-2003 |
Guidelines for determining the characteristics of heat resistance and durability of metal boilers, turbines and pipelines
|
RUSS168827 |
RD 153-34.1-20.597-2001 |
Recommended Practice and Example of Calculation of Energy Characteristics of Piped Hot Water Heat Supply Networks According to Thermal Losses Indicator
|
RUSS149039 |
RD 153-34.1-02.319-2001 |
Guidelines for the determination of the F coefficient in the assessment of air pollution from solid emissions from thermal power plants, taking into account the dispersion of fly ash
|
RUSS164113 |
RD 153-34.2-35.520-99 |
General Technical Requirements for Hardware/Software Complexes for Automated Process Control Systems Hydroelectric Generating Stations
|
RUSS144887 |
RD 153-34.0-03.299-2001 |
Compendium of Model Occupational Safety and Health Guidelines for Fitting and Assembly Operations
|
RUSS143543 |
RD 153-34.1-37.313-00 |
Method for Thermal Chemistry Tests of Stationary Natural-Circulation Steam Boilers
|
RUSS146734 |
SO 153-34.10.171-76 |
Typical norms and standards for the need for redundant electrical equipment of substations 6-110 kV rural electric networks
|
RUSS374358 |
RD 153-34.0-44.221-2000 |
Guidelines for Quality Control of Diesel Fuel at Thermal Power Stations During Acceptance, Storage, and Use of it as Main, Backup, or Start-Stop Fuel in Gas Turbine and Steam-Gas Units
|
RUSS145196 |
RD 153-34.1-11.313-99 |
Method for Measurements of Temperature of Reheater Steam in Thermal Power Station Process Equipment
|
RUSS146698 |
RD 153-34.0-03.299/4-2001 |
Typical instruction on labor protection when working with hand power tools
|
RUSS164082 |
SO 153-34.02.316-2003 |
Procedure of estimation of emissions of benz(o)pyrene to atmosphere by steam boilers of power stations
|
RUSS305468 |
RD 153-34.0-03.294-00 |
Model Occupational Safety and Health Guidelines for Operation of Drilling Machines
|
RUSS147083 |
RD 153-34.0-03.289-00 |
Model Occupational Safety and Health Guidelines for Operation of Screw Cutting Lathes
|
RUSS147087 |
OST 153-34.0-988-99А |
Assembling units and station pipeline hang details of nuclear power plants. Nuclear pressure is no more than 4,0 MPa. Welded block of a hang for vertical pipelines. Design and dimensions.
|
RUSS99598 |
RD 153-34.0-03.231-00 |
Model Instruction Occupational Safety and Protection for Electrical Welders
|
RUSS16238 |
RD 153-34.3-20.409-99 |
Guidelines on Definition of Concepts and Classification of Types of Work and Measures in the Power Industry Electrical Networks as Applied to New Construction, Expansion, Rehabilitation, and Modernization Projects
|
RUSS145358 |
RD 153-34.1-21.324-98 |
Method for Inspection of Wall Enclosures of Buildings and Structures at Thermal Power Stations
|
RUSS146662 |
RD 153-34.1-22.508-2001 |
Procedural Guidelines for the Determination of Sufficiency of Electric Power for Circulating Water Supply Systems for Electric Power Generating Stations
|
RUSS148568 |
OST 1-35001-78 |
Cylindrical pins with landing PR2 2A. Design and dimensions
|
RUSS132858 |
RD 153-34.1-17.467-2001 |
Rapid method for evaluating remaining life of boiler header and steam pipeline joints according to structure factor.
|
RUSS126085 |
RD 153-34.0-35.645-97 |
Procedural Guidelines for Maintenance of Relay RSM-13
|
RUSS148413 |
RD 153-34.1-17.462-00 |
Procedural Guidelines Assessment of Serviceability of Steam Turbine Blades in the Process of Manufacturing, Operation, and Repair
|
RUSS148264 |
RD 153-34.1-11.315-99 |
Method for Measurements of Flow Rate of Natural Gas Supplied to Boilers at Thermal Power Stations
|
RUSS146673 |
RD 153-34.3-48.516-98 |
Method for In-Service Maintenance of Telecontrol Devices in Electric Power Grid Facilities
|
RUSS146659 |
OST 153-34.0-987-99A |
Assembly units and suspension parts of nuclear power plant station pipelines Py <= 4.0 MPa (40 kgf/cm2). Suspension unit with support beam. Design and dimensions
|
RUSS300665 |
SO 153-34.20.822 |
Departmental enlarged unit prices (VUER) for the repair and maintenance of electrical networks of energy associations. Issue 10. Power transformers and reactors
|
RUSS168852 |
RD 153-34.1-30.106-00 |
Rules for technical operation of gas-handling facilities for gas-turbine and combined-cycle units at thermal power plants
|
RUSS15731 |
RD 153-34.0-11.117-2001 |
Information and measurement systems. Metrological support. General provisions.
|
RUSS21030 |
SO 153-34.20.818 |
Departmental enlarged unit prices (VUER) for the repair and maintenance of electrical networks of energy associations. Issue 5. Relay protection and automatics. Substation connections
|
RUSS168848 |
RD 153-34.1-39.502-98 |
Guidelines for Operation and Procedure and Schedule for Checking safety Devices for Vessels, Apparatus, and Piping Systems of Thermal Power Stations
|
RUSS145166 |
SO 153-34.20.122-2006 |
Standards for technological design of AC substations with the highest voltage of 35-750 kV
|
RUSS168830 |
RD 153-34.1-21.326-2001 |
Procedural Guidelines for Inspection of Structural Elements of Process Buildings and Structures of Thermal Power Stations. Part 1: Reinforced Concrete and Concrete Structures
|
RUSS148399 |
OST 1-35002-78 |
Cylindrical pins with landing PR2 2A. Design and dimensions
|
RUSS132859 |
RD 153-34.1-11.304-98 |
Method for Measurements of Pressure of Spent Steam in Steam Turbine Condensers
|
RUSS146688 |
RD 153-34.1-39.603-99 |
Fittings repair manual of high parameters.
|
RUSS126089 |
RD 153-34.1-37.531-00 |
Standard Water Chemistry Process for High Pressure Drum Boilers
|
RUSS150296 |
RD 153-34.0-15.502-2002 |
The leading document. Methodical instructions on control and the analysis of electric energy quality in general purpose power supply systems. Part 2. Analysis of electric energy quality.
|
RUSS20670 |
SO 153-34.20.501-03 |
Rules for the technical operation of power plants and networks of the Russian Federation
|
RUSS374389 |
RD 153-34.1-08.556-99 |
Procedural Guidelines for Execution of Report for a Thermal Power Station on Use of Equipment
|
RUSS148339 |
SO 153-34.08.105-2004 |
Regulation on the assessment of the readiness of electricity and heat supply organizations to work in the autumn-winter period
|
RUSS168812 |
RD 153-34.0-20.527-98 |
Guideline on calculation of short circuit currents and electric equipment choice.
|
RUSS126075 |
RD 153-34.0-03.292-00 |
Model Occupational Safety and Health Guidelines for Operation of Grinding Machines
|
RUSS147084 |
RD 153-34.1-04.187-2002 |
The main provisions and requirements of the Contract for the repair of power equipment, when performing work with self-supporting repair sites and power plant crews
|
RUSS164115 |
RD 153-34.1-43.106-2001 |
Model Guidelines for Acceptance, Storage, and Use of Fireresistant Turbine Oils Type OMTI
|
RUSS146912 |
RD 153-34.0-11.118-2001 |
Ordinance on Work of UES of Russia, RAO Aimed at Confirming Compliance of Purchased Energy Equipment with Industry-Specific Requirements and Operating Conditions
|
RUSS147814 |
SO 153-34.20.187-2003 |
Recommendations for technological design of AC substations with the highest voltage of 35 - 750 kV
|
RUSS168833 |
SO 153-34.02.317-2003 |
Guidelines for estimating emissions of pollutants into the atmosphere from auxiliary production of thermal power plants and boilers
|
RUSS168808 |
SO 153-34.17.469-2003 |
Instructions for extending the safe operation period for steam boilers with working pressure up to 4.0 MPa inclusive and hot water boilers with water temperature above 115 °C.
|
RUSS126581 |
SO 153-34.20.834 |
Departmental enlarged unit prices for work on the technical re-equipment of electrical networks of energy associations (economic method). Release 2. Distribution networks
|
RUSS168863 |
RD 153-34.1-09.164-00 |
Model program for conducting energy audits of the systems of transport and distribution of thermal energy (heat networks)
|
RUSS164117 |
OST 153-34.0-1000-99А |
Assembling units and station pipeline hang details of nuclear power plants. Nominal pressure is no more than 4,0 MPa. Threaded drafts with coupling. Design and dimensions.
|
RUSS99575 |
SO 153-34.20.523-2003 Part 1 |
Guidelines for the compilation of energy characteristics for thermal energy transport systems in terms of "the difference in temperature of network water in supply and return pipelines" and "specific energy consumption"
|
RUSS168838 |
RD 153-34.0-20.408-97 |
Acceptance Procedures for Overhead Electric Power Transmission Lines at Voltage of 0.38 kV with Self-Supporting Insulated Conductors
|
RUSS142863 |
RD 153-34.0-02.107-98 |
Method for assessing wind erosion and dusting of coal-fired power plants
|
RUSS164074 |
OST 153-34.0-1004-99А |
Assembling units and station pipeline hang details of nuclear power plants. Nominal pressure is no more than 4,0 MPa. Spring bloc of hang. Design and dimensions.
|
RUSS99579 |
RD 153-34.1-17.465-00 |
Methodological guidelines for the assessment of internal corrosion driving rat in heating systems.
|
RUSS126084 |
RD 153-34.0-02.303-98 |
Instructions for regulation of emissions of air pollutants for thermal power plants and boilers.
|
RUSS126070 |
RD 153-34.0-35.647-99 |
Procedural Guidelines for Maintenance of Intermediate Relays RP 8, RP 9, RP 11, RP 12, RP 16, RP 17, and RP 18 and Time Relays RVO 1, RVO 3, RSV 13, and RSV 14
|
RUSS148412 |
SO 153-34.21.322-2003 |
Guidelines for the organization and conduct of observations of the deposition of foundations and deformations of buildings and structures under construction and operating thermal power plants
|
RUSS168867 |
RD 153-34.0-35.518-01 |
Gas protection instruction manual
|
RUSS374296 |
OST 153-34.0-970-99А |
Assembling units and support station pipeline details of nuclear power plants. Nominal pressure is no more than 2,5 MPa. The plug for passage through the ceiling. Design and dimensions.
|
RUSS99583 |
RD 153-34.1-39.605-2002 |
General Requirements and Guidelines for Use of Thermally Expanded Graphite Seals in Thermal Power Station Valves
|
RUSS144864 |
RD 153-34.1-44.222-2001 |
Solid mineral fuel. The method of sampling gaseous emissions of power plants during the combustion of solid fuels to determine the concentration of mercury vapor. Methods for measuring the mass concentration of mercury using flameless atomic absorption
|
RUSS164145 |
OST 1-35000-78 |
Cylindrical pins with landing PR2 2A. Design and dimensions
|
RUSS132857 |
OST 153-34.0-979-99A |
Assembly units and support parts for station pipelines of nuclear power plants Py <= 4.0 MPa (40 kgf/cm2). Half holders and gaskets. Design and dimensions
|
RUSS300660 |
RD 153-34.0-11.119-2001 |
Procedural Guidelines. Recordkeeping and Storage of Means of Measurement in Use at Electric Power Facilities
|
RUSS148644 |
OST 153-34.0-1001-99А |
Assembling units and station pipeline hang details of nuclear power plants. Nominal pressure is no more than 4,0 MPa. Block of hang fastening. Design and dimensions.
|
RUSS99576 |
RD 153-34.0-11.414-98 |
Procedural Guidelines. Determination of Periods Between Calibration of Means of Measurement, in Use at Electric Power Facilities. Organization and Procedure
|
RUSS148621 |
RD 153-34.0-09.161-97 |
Ordinance on Specified Power Output Characteristics of Turbine Generators and Hydroelectric Generating Stations
|
RUSS147802 |
RD 153-34.2-03.205-2001 |
Safety Requirements for Maintenance of Hydraulic Structures and Hydromechanical Equipment of Power Utility Organizations
|
RUSS149674 |