Surfacing

Sort By:
Products per page:
Viewing Page 1 of 33
ATPE 9-09
A typical program for the operational control of the state of the base metal and welded joints of equipment and pipelines of nuclear power plants with VVER-1000 RP during operation
ETCS Issue 2
Unified tariff qualification reference book of works and professions of workers. Sections: "Foundry", "Welding", "Boiler, cold-forging, drawing and pressing", "Forge-pressing and thermal work", "Mechanical processing of metals and other materials", "Metal plating and painting", "Enameling", Locksmithing and assembly work "
GOST 10051-75
Metal covered electrodes for manual arc surfacing of upper layers with special properties types
Price: $217.00
GOST 10543-82
Surfacing steal wire. Specifications
Price: $139.93
GOST 10543-98
Steel surfacing wire. Specifications
Price: $283.00
GOST 11930.0-79
Hard-facind materials. General requirements for methods of analysis
Price: $168.00
GOST 12.2.007.8-75
Devices for electric welding and plasma treatment
Price: $184.00
GOST 12.2.008-75
Equipment and facilities for gas-flame treatment of metals and thermal
Price: $184.00
GOST 12.2.063-2015
Pipeline valves. General safety requirements
Price: $315.00
GOST 12.3.003-86
Occupational safety standards system Electric welding works. Safety requirements
Price: $217.00
GOST 12.3.036-84
Occupational safety standards system. Flame machining of metals. Safety requirements
Price: $250.00
GOST 12.3.039-85
Occupational safety standards system. Plasma treatment of metals. Safety requirements
Price: $283.00
Viewing Page 1 of 33

All Codes and Regulations

All Categories

Send us a message Expand Collapse

Leave your message in the form below, and we will write back by e-mail!