RD 34.15.027-93

РД 34.15.027-93

Welding, Heat Treatment, and Testing of Boiler Tube Systems and Piping During Installation and Repair of Electric Supply Station Equipment (RTM-1s-93)

Сварка, термообработка и контроль трубных систем котлов и трубопроводов при монтаже и ремонте оборудования электростанций (РТМ-1с-93)

Status: Not effective - Superseded

The document is intended for personnel engaged in organizing and carrying out assembly and welding work during the installation and repair of pipelines and pipe systems of steam and hot water boilers, regardless of the parameters of the working environment, as well as in the manufacture of pipelines with a working pressure of 2.2 MPa (22 kgf

Документ предназначен для персонала, осуществляющего организацию и производство сборочно-сварочных работ при монтаже и ремонте трубопроводов и трубных систем паровых и водогрейных котлов независимо от параметров рабочей среды, а также при изготовлении трубопроводов с рабочим давлением до 2,2 Мпа (22 кгс/см2) и температурой не более 425 градусов Цельсия.

Choose Language: 
Format: Electronic (pdf/doc)

Approved: Ministry of Fuel and Energy of the Russian Federation, 12/30/1993

SKU: RUSS151508




Price: imgalt
imgalt

The Product is Contained in the Following Classifiers:

Power Industry » 15. Product Quality »

Construction (Max) » Regulations » Regulatory documents of supervisory authorities » Regulatory documents of State Energy Supervision »

Welding regulations » Welding work »

Welding regulations » Defects »

Welding regulations » Assembly devices »

Welding regulations » Welding work » Mechanized welding »

Welding regulations » Welding work » Automatic welding »

Welding regulations » Welding work » Surfacing »

Welding regulations » Welding work » Dusting »

PromExpert » SECTION IV. INDUSTRIAL SAFETY » II Industrial safety requirements for operation of a hazardous production facility » 2 Special industrial safety requirements for operation of a hazardous production facility » 2.6 Industrial safety requirements for pressure equipment »

PromExpert » SECTION III. LABOR PROTECTION AND SAFETY » III Occupational safety requirements for production equipment and processes » 2 Safety requirements for certain types of work » 2.10 Operation of electrical installations, electrical equipment and power tools »

ISO classifier » 25 MECHANICAL ENGINEERING » 25.160 Welding, brazing and hard soldering » 25.160.10 Welding Processes »

ISO classifier » 25 MECHANICAL ENGINEERING » 25.200 Heat treatment »

ISO classifier » 27 ENERGY AND HEATING TECHNOLOGY » 27.060 Burners. Boilers » 27.060.01 Burners and boilers in general »

ISO classifier » 27 ENERGY AND HEATING TECHNOLOGY » 27.060 Burners. Boilers » 27.060.30 Boilers and heat exchangers »

ISO classifier » 27 ENERGY AND HEATING TECHNOLOGY » 27.100 Power stations in general »


The Document is Replaced With:

RD 153-34.1-003-01: Welding, heat treatment and control of copper pipe systems and pipelines at power equipment installation and repair.

The Document References:

GOST 10052-75: Metal covered electrodes, for manual arc welding of high-alloyed steels with special properties. Types

GOST 10157-79: Gaseous and liquid argon. Specifications

GOST 1050-88: Carbon structural quality steel gauged bars with special surface finish. General specifications

GOST 1460-81: Calcium carbide. Technical conditions

GOST 14782-86: Nondestructive testing. Welded joints. Ultrasonic methods

GOST 1779-83: Asbestos cord

GOST 19281-89: Rolled steel with increased strength. General specifications

GOST 20072-74: Heat-resistant steel

GOST 21880-86: Stitched mineral wool mats. Technical requirements

GOST 2246-70: Welding steel wire. Specifications

GOST 23949-80: Welding non-consumable tungsten electrodes specifications.

GOST 26271-84: Flux-cored wire welding carbon and low-alloy steels. General specifications

GOST 2850-95: Asbestos paperboard

GOST 380-88: Common quality carbon steel. Grades

GOST 4543-71: Structural alloyed steel

GOST 5457-75: Dissolved acetylene and gaseous acetylene for technical purposes. Specifications

GOST 5583-78: Industrial and medical gaseous oxygen

GOST 5632-72: High-alloy steels and corrosion-proof, heat-resisting and heat treated alloys. Grades

GOST 5639-82: Steel and alloys. Methods for detection and determination of grain size

GOST 6102-78: Asbestos cloth. Specifications

GOST 6996-66: Welded joints. Methods of mechanical properties determination

GOST 7512-82: Nondestructive testing. Welded joints. Radiography method

GOST 8.513-84: State system for ensuring the uniformity of measurements. Verification of measuring instruments. Organization and procedure

GOST 8050-85: Carbon dioxide,

GOST 839-80: Uninsulated cables for aerial power

GOST 9466-75: Covered metal electrodes for manual arc welding of steels and deposition. Classification and general specifications

GOST 9467-75: Metal covered electrodes for manual arc welding of structural and heat-resistant steels. Types

GOST 977-88: Steel castings. General specifications

OST 108.030.113-87: Carbon and alloy steel forgings for thermal and nuclear power stations equipment and pipelines. Technical specifications.

PB 10-575-03: Requirements for the Design and Safe Operation of Electric Boilers and Electric Boiler Plants

RD 108.021.112-88: Correction of defects in the cast hull parts of steam turbines and valves by welding without heat treatment

RD 2730.940.103-92: Steam and hot water boilers, steam and hot-water-pipelines. Welding. General requirements.

RD 34.10.122: Consumption rates of hammers for hammer crushers

SN 527-80: Instructions on Designing of Steel Process Piping, Рnom up to 10 MPa

SNiP 3.05.03-85: Heat networks

SNiP 3.05.05-84: Processing equipment and process pipelines

The Document is Referenced By:

Model series 20.0027: Reinforced Concrete Supports for Joint Suspension of 10 kV Overhead Line Protected Wires and Self-Carrying Insulated Wires of Double-Chain 0.4 kV Overhead Line. Working drawings

OST 108.940.02-82: Welded joint Seams of thermal power plants pipelines. Types and main dimensions.

OST 24.125.60-89: Details and prefabricated units of steam and hot water in thermal power plants. General Specifications.

OST 34-10-504-95: Details and components of TPS pipelines. Flanged connections for disk orifice plates of TPS pipelines for Pnom 2.5 MPa (25 kg/cm2). Construction and dimensions.

OST 34-10-723-93: Assembling units and station pipeline hang details, Working pressure<2,2 MPa of CHP plant, nuclear thermal power plant and dust-and-gas windpipes of CHP plant. General technical requirements.

OST 34-10-748-97: Parts and assembly units of pipelines of TPPs at Rrab <2.2 MPa (22 kgf

OST 34-10-752-97: Parts and assembly units of pipelines of TPPs at Rrab <2.2 MPa (22 kgf

OST 34-10-753-97: Parts and assembly units of pipelines of TPPs at Rrab <2.2 MPa (22 kgf

OST 34-10-761-97: Parts and assembly units of pipelines of TPPs at Rrab <2.2 MPa (22 kgf

OST 36-26-77: Welded details of pipelines Dy 500-1400 mm made of carbon steel for Pnom <= 2.5 MPa (≈ 25 kg/cm2). General technical requirements.

OTU 3-01: Vessels and apparatuses. General specifications for the repair of buildings

RD 10-69-94: Typical technological process of installation electrical equipment. Main provisions.

RD 153-34.0-03.107-2001: Model Ordinance on the Occupational Safety and Health Office in Electric Power Organizations

RD 153-34.0-20.522-99: Model Guidelines for Periodic In-Service Technical Certification of Pipelines of Piped Heat Supply Networks

RD 153-34.1-003-01: Welding, heat treatment and control of copper pipe systems and pipelines at power equipment installation and repair.

RD 153-34.1-17.461-00: Methodological guidelines for penetrant testing of welded joints, weld pads and parent metal during manufacturing, installation, operation and repairing of power equipment.

RD 153-34.1-39.603-99: Fittings repair manual of high parameters.

RD 24.020.11-93: Welded joints of stationary steam, gas and hydraulic turbines. Testing rules and quality evaluation standards.

RD 34.10.124-94: Instructions for the preparation and storage of welding materials

RD 34.10.126-94: Instructions for operational control of assembly processes, welding and heat treatment.

RD 34.10.130-96: Instructions for visual and measuring control.

RD 34.17.302-97: Steam and hot water boilers, steam and hot-water-pipelines. Welding. General requirements. Quality control. Ultrasonic control. Main principles.

RD 34.17.310-96: Welding, Heat Treatment, and Inspection During In-Service Repair of Welded Joints in Boiler Tubing Systems and Steam Lines

RD 34.17.401-95: Instructions for scope and procedure of metal input control of power equipment with pressure of 9 MPa and more, before its commissioning.

RD 34.17.405-96: Procedural Guidelines for Ultrasonic Inspection of Thin-Wall Components of Steam Superheaters and Steam Lines

RD 34.17.435-95: Methodological instructions. Technical diagnostics of boilers with working pressure up to 4.0 MPa inclusive.

RD 34.17.437-95: Guidelines. Nondestructive Magnetic Method for Diagnostics of Welded Joints in Tubing Systems of Boilers and Piping Systems of Energy Facilities

RD 34.26.609-97: Procedural Guidelines for Organization of Maintenance Heating Surfaces of Thermal Power Station Boilers

RD 34.39.201: Guidelines for Installation of Steam and Water Piping Systems in Thermal Power Stations

RD RosJeK 05-014-98: Guidelines for expert examination of pipelines of steam and hot water of category IV, supervised by the Gosgortekhnadzor of Russia

TU 34-38-20120-94: Pipelines of station thermal stations. General technical conditions for major repairs

TU 34-38-20140-94: Valves of gas pipelines TPP. General technical conditions for major repairs

TU 34-38-20189-94: Gas-oil burners for steam stationary boilers. Technical conditions for major repairs

TU 34-38-20197-94: Valves for steam and water DN 10, 20, 40, 50, 65 mm Chekhov factory of power engineering. Technical conditions for major repairs

TU 34-38-20201-94: Stationary steam boilers. Piping within the boiler. General technical conditions for major repairs

TU 34-38-20202-94: Stationary steam boilers. Collectors. General technical conditions for major repairs

TU 34-38-20219-94: Economizers smooth tube steam stationary boilers. Technical conditions for major repairs

TU 34-38-20220-94: Smooth tube steam stationary boilers with natural circulation screens. Technical conditions for major repairs

TU 34-38-20409-94: Pulse-safety devices Chekhov factory of power engineering. General technical conditions for major repairs

Customers Who Viewed This Item Also Viewed:

imgalt imgalt
Square steel tubes. Range
Language: English
Price: $102.00
imgalt
Design norms for antiseismic atomic power stations
Language: English
Price: $196.02
imgalt
Federal norms and rules in the field of the use of atomic energy. Valves for nuclear power plants. General technical requirements
Language: English
Price: $1,514.00
imgalt
Electric locomotives. General technical requirements
Language: English
Price: $282.00
imgalt
Pipeline valves. Leakage rates of valves
Language: English
Price: $499.00
imgalt
Federal Standards and Rules in the Field of Atomic Energy Use
Language: English
Price: $334.00
imgalt
Locomotive and motor rolling stock. Requirements of fire safety
Language: English
Price: $169.00
imgalt
Railway rolling stock. Methods for monitoring the performance of fire alarm and fire extinguishing systems
Language: English
Price: $139.00
imgalt

YOUR ORDERING MADE EASY!

RussianGost.com is an industry-leading company with stringent quality control standards and our dedication to precision, reliability and accuracy are some of the reasons why some of the world’s largest companies trust us to provide their national regulatory framework and for translations of critical, challenging, and sensitive information.

Our niche specialty is the localization of national regulatory databases involving: technical norms, standards, and regulations; government laws, codes, and resolutions; as well as RF agency codes, requirements, and Instructions.

We maintain a database of over 220,000 normative documents in English and other languages for the following 12 countries: Armenia, Azerbaijan, Belarus, Kazakhstan, Kyrgyzstan, Moldova, Mongolia, Russia, Tajikistan, Turkmenistan, Ukraine, and Uzbekistan.

Placing Your Order

Please select your chosen document, proceed to the ‘checkout page’ and select the form of payment of your choice. We accept all major credit cards and bank wire transfers. We also accept PayPal and Google Checkout for your convenience. Please contact us for any additional arrangements (Contract agreements, PO, etc.).

Once an order is placed it will be verified and processed within a few hours up to a rare maximum of 24 hours.

For items in stock, the document/web link is e-mailed to you so that you can download and save it for your records.

For items out of stock (third party supply) you will be notified as to which items will require additional time to fulfil. We normally supply such items in less than three days.

Once an order is placed you will receive a receipt/invoice that can be filed for reporting and accounting purposes. This receipt can be easily saved and printed for your records.

Your Order Best Quality and Authenticity Guarantee

Your order is provided in electronic format (usually an Adobe Acrobat or MS Word).

We always guarantee the best quality for all of our products. If for any reason whatsoever you are not satisfied, we can conduct a completely FREE revision and edit of products you have purchased. Additionally we provide FREE regulatory updates if, for instance, the document has a newer version at the date of purchase.

We guarantee authenticity. Each document in English is verified against the original and official version. We only use official regulatory sources to make sure you have the most recent version of the document, all from reliable official sources.

All Codes and Regulations

All Categories

Send us a message Expand Collapse

Leave your message in the form below, and we will write back by e-mail!