PB 03-591-03
ПБ 03-591-03
|
|
Rules of design and safe operation of flare systems
Правила устройства и безопасной эксплуатации факельных систем
Status: Not effective - Canceled. By order of the Federal Service for Ecological, Technological and Nuclear Supervision dated December 29, 2012 No. 801, the Resolution of the Federal Mining and Industrial Supervision of Russia dated June 10, 2003 No. 83 was declared non-applicable.
Rules for the safe operation of flare systems establish requirements aimed at ensuring industrial safety, preventing accidents, industrial accidents during the operation of flare systems in the chemical, petrochemical and petroleum refining industries
Правила безопасной эксплуатации факельных систем устанавливают требования, направленные на обеспечение промышленной безопасности, предупреждение аварий, случаев производственного травматизма при эксплуатации факельных систем в химической, нефтехимической и нефтеперерабатывающей промышленности
Choose Language:
Format: Electronic (pdf/doc)
Approved: Gosgortekhnadzor of Russia,
6/10/2003
SKU: RUSS16608
The Product is Contained in the Following Classifiers:
Construction (Max) »
Regulations »
Regulatory documents of supervisory authorities »
Regulatory documents of Gosgortekhnadzor »
Technical Supervision »
Section I. Technological, construction, energy supervision and environmental protection regarding limitation of negative anthropogenic impact »
IV. Regulatory legal acts and regulations »
2. Industrial safety »
2.1. Common to various hazardous production facilities »
PromExpert »
SECTION IV. INDUSTRIAL SAFETY »
II Industrial safety requirements for operation of a hazardous production facility »
1 General industrial safety requirements for operation of a hazardous production facility »
ISO classifier »
75 EXTRACTION AND PROCESSING OF OIL, GAS AND RELATED PRODUCTION »
75.180 Equipment for oil and gas industry »
75.180.99 Other equipment for oil and gas industry »
As a Replacement Of:
PB 09-12-92: Rules on the flare system design and safe operation
The Document References:
PB 03-517-02: Regulations for Organizations Executing Activity in the Field of Industrial Safety at Hazardous Production Facilities
PB 09-12-92: Rules on the flare system design and safe operation
The Document is Referenced By:
DiOR 05: Methodology of diagnosing of technical condition and determining of residual life of process equipment of oil refineries and petrochemical plants
GOST R 53681-2009: Flare parts for general refinery and petrochemical service. General technical requirements
OST 26.260.18-2004: Process modules for oil and gas industry. General technical specifications
PB 08-342-00: Safety regulations at production, storing and delivery of liquefied natural gas at gas distribution stations of gas main pipelines (GDS GMP) and car gas-filling compressor stations
PB 09-540-03: General codes on explosion protection for explosive and fire hazardous chemical, petrochemical plants and oil refineries
PB 11-401-01: Safety regulations for gas-handling facilities of metallurgic and coke-chemical industries and enterprises
Recommendations: Aspiration smoke-sensitive alarms VESDA. Part 1. Scope
SA 03-005-07: Industrial pipelines of oil-refining, petrochemical and chemical industry. Requirements to configuration and operation
VNTP 81-85: Norms of technological design for petroleum-refining and organic synthesis products manufacture enterprises
Customers Who Viewed This Item Also Viewed:
 |
Jet fuels
Language: English |
State system for ensuring the uniformity of measurements. Measurements of liquids and gases flow rate and quantity by means of orifice instruments. Part 5. Measurement procedure
Language: English |
Molded parts of coupler and automatic coupler devices of railway rolling stock. General specifications.
Language: English |
Main-line diesel locomotives. General technical requirements.
Language: English |
Four-wheel bogies of freight cars for mainline railways gauge 1520 (1524) mm. Specifications
Language: English |
Technical ethylcellosolve. Specifications
Language: English |
Automatic coupler model SA-3 and its components. Design and dimensions
Language: English |
Railway rolling stock. Devices to prevent running gear parts from dropping to the track. Methods of controlling strength characteristics
Language: English |
Electric heating devices for heating rolling stock railways. Safety requirements and test methods
Language: English |
Ice cream. General technical requirements
Language: English |
Welded joints in steel structures of railway rolling stock. Requirements for design, implementation and quality control
Language: English |
Locomotives The method of dynamic strength tests
Language: English |
Pipe fittings. Ball valves made of brass. General specifications
Language: English |
Railway rolling stock. Norms for permissible exposure of railway track and test methods
Language: English |
Locomotives. Requirements for strength and dynamic qualities
Language: English |
 |
|
YOUR ORDERING MADE EASY!
RussianGost.com is an industry-leading company with stringent quality control standards and our dedication to precision, reliability and accuracy are some of the reasons why some of the world’s largest companies trust us to provide their national regulatory framework and for translations of critical, challenging, and sensitive information.
Our niche specialty is the localization of national regulatory databases involving: technical norms, standards, and regulations; government laws, codes, and resolutions; as well as RF agency codes, requirements, and Instructions.
We maintain a database of over 220,000 normative documents in English and other languages for the following 12 countries: Armenia, Azerbaijan, Belarus, Kazakhstan, Kyrgyzstan, Moldova, Mongolia, Russia, Tajikistan, Turkmenistan, Ukraine, and Uzbekistan.
Placing Your Order
Please select your chosen document, proceed to the ‘checkout page’ and select the form of payment of your choice. We accept all major credit cards and bank wire transfers. We also accept PayPal and Google Checkout for your convenience. Please contact us for any additional arrangements (Contract agreements, PO, etc.).
Once an order is placed it will be verified and processed within a few hours up to a rare maximum of 24 hours.
For items in stock, the document/web link is e-mailed to you so that you can download and save it for your records.
For items out of stock (third party supply) you will be notified as to which items will require additional time to fulfil. We normally supply such items in less than three days.
Once an order is placed you will receive a receipt/invoice that can be filed for reporting and accounting purposes. This receipt can be easily saved and printed for your records.
Your Order Best Quality and Authenticity Guarantee
Your order is provided in electronic format (usually an Adobe Acrobat or MS Word).
We always guarantee the best quality for all of our products. If for any reason whatsoever you are not satisfied, we can conduct a completely FREE revision and edit of products you have purchased. Additionally we provide FREE regulatory updates if, for instance, the document has a newer version at the date of purchase.
We guarantee authenticity. Each document in English is verified against the original and official version. We only use official regulatory sources to make sure you have the most recent version of the document, all from reliable official sources.