Status: Not effective. By order of the Federal Service for Ecological, Technological and Atomic Supervision dated January 25, 2013 No. 28 to consider the resolution of the Federal Mining and Industrial Supervision of Russia dated June 10, 2003 No. 80 as non-applicable (the order shall enter into force 10 days after its official publication, the text of the order published in the "Rossiyskaya Gazeta" dated 02.26.2013 No. 41)

The rules apply to projected, newly manufactured and modernized steel process pipelines designed to transport gaseous, vaporous and liquid media in the range of residual pressure (vacuum) of 0.001 MPa

Правила распространяются на проектируемые, вновь изготавливаемые и модернизируемые стальные технологические трубопроводы, предназначенные для транспортирования газообразных, парообразных и жидких сред в диапазоне от остаточного давления (вакуума) 0,001 МПа (0,01 кгс/см2) до условного давления 320 МПа (3200 кгс/см2) и рабочих температур от минус 196 °С до 700 °С и эксплуатирующиеся на опасных производственных объектах

Choose Language: 
Format: Electronic (pdf/doc)

Approved: Gosgortekhnadzor of Russia, 6/10/2003

SKU: RUSS19495

Price: $450.00

imgalt

The Product is Contained in the Following Classifiers:

Construction (Max) » Regulations » Regulatory documents of supervisory authorities » Regulatory documents of Gosgortekhnadzor »

Welding regulations » Welding work »

Welding regulations » Main materials »

Welding regulations » Pipelines »

Welding regulations » Metal structures »

Welding regulations » Welding materials »

Welding regulations » welding equipment »

Welding regulations » Welding staff »

Welding regulations » Certification »

Welding regulations » Documentation »

Welding regulations » Non-destructive control »

Welding regulations » Mechanical Testing »

Welding regulations » Heat treatment »

Welding regulations » Defects »

Welding regulations » Assembly devices »

Welding regulations » Welding work » Surfacing »

Welding regulations » Welding work » Dusting »

Welding regulations » Main materials » Steel, cast iron »

Welding regulations » Welding materials » Electrodes »

Welding regulations » Welding materials » Fluxes »

Welding regulations » Welding materials » Gases »

Technical Supervision » Section I. Technological, construction, energy supervision and environmental protection regarding limitation of negative anthropogenic impact » IV. Regulatory legal acts and regulations » 2. Industrial safety » 2.1. Common to various hazardous production facilities »

PromExpert » SECTION V. ENVIRONMENTAL PROTECTION. NATURE USE » II Ensuring environmental safety » 4 Ensuring environmental safety during subsoil use » 4.2 Use and protection of subsoil » 4.2.4 Environmental safety requirements in design, installation and operation of submarine cables and pipelines »

ISO classifier » 75 EXTRACTION AND PROCESSING OF OIL, GAS AND RELATED PRODUCTION » 75.200 Equipment for oil refining, oil products and natural gas » 2003.200.13 Pipelines and their components »


As a Replacement Of:

PB 03-108-96: Process pipeline design and safe operation rules

The Document References:

PB 03-517-02: Regulations for Organizations Executing Activity in the Field of Industrial Safety at Hazardous Production Facilities

Safety Guide: Recommendations on arrangement and safe operation of process pipelines

Safety Guide: Recommendations on technical diagnostics of welded vertical cylindrical tanks for oil and petroleum products

The Document is Referenced By:

GOST 31829-2012: Ozonization equipment. Safety requirements

GOST R 52906-2008: Equipment of the aviation fuelling system. General technical requirements

GOST R 53177-2008: Vacuum technology. Measurement of performance characteristics of mass-spectrometer method of tightness control

GOST R 53671-2009: Pipeline valves. Swing and lift check valves. General specifications

GOST R 53672-2009: Pipeline valves. General safety requirements

GOST R 53673-2009: Pipeline valves. Butterfly wicket valves. General specifications

GOST R 54317-2011: Launching and technical complexes of space-rocket complexes. Safety requirements

GOST R 54432-2011: Flanges for valves, fittings, and pipelines for pressure from PN 1 to PN 200. Design, dimensions and general technical requirements

GOST R 54892-2012: Installation of air separation plants and other cryogenic equipment. General provisions

GOST R 55005-2012: Renewable power engineering. Geothermal power plants. Safety requirements under operation

GOST R 55073-2012: Resistance polymer composites for repairing industrial pipe-line. Specifications

GOST R 55164-2012: Mining equipment. Movable mine compressor stations. Safety requirements and test methods

GOST R 55429-2013: Hoop-in detachable joints of pipelines. Design, dimensions and general specifications

GOST R 55430-2013: Detachable pipe joints. Evaluation of technical condition and methods of testing. Operation safety

GOST R 55599-2013: High pressure pipeline assembly units and components above 10 up to 100 MPa. General technical requirements

GOST R 56001-2014: Pipeline valves for objects of gas industry. General specifications

GOST R 56006-2014: Pipeline valves. Testing and acceptance on objects of the gas main pipelines before commissioning. General technical requirements

MI 1974-2004: State system for ensuring uniformity of measurements. Turbine flow transducers. Method of verification

MI 2904-2005: Recommendation. State system for ensuring uniformity of measurements. Ultrasonic counters Altosoni-5 (mod. Altosoni-5M). Methods of calibration testing by a truboporshnevoy calibration unit at the metering of petroleum products

MI 2956-2005: Recommendation. State system for ensuring uniformity of measurements. Ultrasonic transducers of oil consumption with a nominal diameter of 400 mm and more. Method of verification

MI 2972-2006: State system of measuring uniformity provision. Petroleum mass. Method of measuring by the system of petroleum quantity and properties measuring system No.1005 JSC ´Shugurovskiy petrochemical plant´

MI 2974-2006: State system of measuring uniformity provision. Class 2 piston-pipe calibration rigs. Verification method for class 1 piston-pipe calibration rig with comparator

MI 3081-2007: Systems of measurement of quantity and quality of oil, light petroleum products and liquid hydrocarbons. Maintenance and repair. Basics

MI 3151-2008: GSE. Mass flow meters. Methods of verification at the site of operation of a piston-calibration calibration unit complete with a flow density converter

MI 3189-2009: State system for ensuring uniformity of measurements. Mass flow meters Micro Motion from "Emerson Process Management". Methods of calibration with a set of pipe piston calibration installation or compact prover and flow density converter

MI 3200-2009: Recommendation. GSE. Mass of crude oil. Methods of measuring the system of measuring the amount and parameters of crude oil at the temporary loading point of the Bayandy field at the Chamber of Commerce and Industry Usinskneftegaz OOO Lukoil-Komi

MI 3265-2010: State system for ensuring uniformity of measurements. Ultrasonic flow transducers. On-site verification method

MI 3266-2010: State system for ensuring uniformity of measurements. Converters volumetric flow reference. Method of verification

MI 3267-2010: State system for ensuring uniformity of measurements. Volume flow transducers. Method of calibration using a standard volume flow converter

MI 3270-2010: State system for ensuring uniformity of measurements. The content of droplet fluid in the stream of natural and associated gas. Measurement Technique

MI 3272-2010: State system for ensuring uniformity of measurements. Mass flow meters. On-site verification method with a compact prover complete with a turbine flow transducer and in-line density transducer

MI 3312-2011: Recommendation. State system for ensuring uniformity of measurements. Ultrasonic flow transducers. Methods of calibration with a set of pipe piston calibration installation, in-line density converter and mass flow meters

MI 3380-2012: State system for ensuring uniformity of measurements. Volume flow transducers. Methods of verification on-site calibration equipment

NTP 10-12976-2000*: Norms of technological design of enterprises of the alcohol industry

OST 26.260.18-2004: Process modules for oil and gas industry. General technical specifications

OTT 1.3.3.99.0141-2012: Valves of pipeline technological systems of nuclear power plants, not affecting safety. General technical requirements

PB 03-557-03: Safety Requirements for Operation of Railway Tank Cars for Transportation of Liquid Ammonia

PB 08-342-00: Safety regulations at production, storing and delivery of liquefied natural gas at gas distribution stations of gas main pipelines (GDS GMP) and car gas-filling compressor stations

PB 09-220-98: Installation and Safe Operation Requirements for Ammonia-Based Refrigeration Equipment

PB 09-540-03: General codes on explosion protection for explosive and fire hazardous chemical, petrochemical plants and oil refineries

PB 09-592-03: Rules for arrangement and safe operation of refrigerating systems

PB 11-401-01: Safety regulations for gas-handling facilities of metallurgic and coke-chemical industries and enterprises

POT R M-018-2001: Intersectoral labor protection rules when applying metal coatings

POT R O-001-2002: Rules on labor protection for printing organizations

RD 01-001-06: Welding of steel gas pipelines and the gas equipment in the city municipal services and power installations.

RD 09-244-98: Instructions for diagnostics of technical condition of vessels, pipes and compressors, industrial ammonia refrigeration plants.

RD 2082-18-2005: Technical diagnosis and design life prolongation program for cryogenic tank.

RD EO 0586-2004: Nuclear power plants equipment and pipelines thermal insulation. Design standards

Recommendations: Aspiration smoke-sensitive alarms VESDA. Part 1. Scope

SA 03-005-07: Industrial pipelines of oil-refining, petrochemical and chemical industry. Requirements to configuration and operation

SA-03-003-07: Stressing and vibration calculation of steel industrial pipelines.

SO 01-05-AKTNP-002-2004: On automation and telemechanization of installations of pipeline transportation system of oil products of JSC "AK" Transnefteprodukt "

SO 34.04.623-2006: Job description of the head of the gas service of thermal power plants and boiler rooms

SO 34.20.514-2005: Guidelines for the operation of the gas economy of thermal power plants

ST TsKBA 008.1-2007: Pipe fittings. Calculation and evaluation of reliability indicators and assigned indicators at the design stage. Part 1. Method of calculating and evaluating reliability indicators and assigned indicators at the design stage

ST TsKBA 008-2011: Pipe fittings. Calculation and evaluation of reliability and safety at the design stage

ST TsKBA 010-2004: Pipe fittings. Forgings, stampings and rolled products. Technical requirements

ST TsKBA 012-2005: Pipe fittings. Studs, bolts, nuts and washers for pipe fittings. Technical requirements

ST TsKBA 025-2006: Pipe fittings. Welding and quality control of welded joints. Technical requirements

ST TsKBA 045-2009: Pipe fittings. Welding and surfacing of parts made of titanium and titanium alloys. Technical requirements and quality control

ST TsKBA 088-2010: Pipe fittings. The quality control program of valves used for hydrogen sulfide environments

ST TsKBA 089-2010: Pipe fittings. Welding defects castings. Technical requirements

STO: Thermal power plants. Methods of assessing the condition of the main equipment

STP 09-04-02(001-STP/A): Calculations for the strength and vibration of steel process pipelines

TR 101-07: Technical recommendations for the design and construction of non-pressure underground pipelines for domestic and rainwater sewage from polyethylene pipes with a two-layer profiled wall "Korsis"

TU 3742-011-34390194-2003: Check valves DN 100-1400 PN 8, 0 MPa; PN 12, 5 MPa; PN 16, 0 MPa. Technical conditions

TU 5728-006-93978201-2008: Sealing gaskets made of thermally expanded graphite (PUTG). Technical conditions

VNP-10041-2002: Departmental norms and rules for creating coastal fishing enterprises. Treatment facilities

VSN 07/02/34 Russian Defense Ministry: Design of fuel depots of the Ministry of Defense of the Russian Federation

Customers Who Viewed This Item Also Viewed:

imgalt imgalt
Controllers acting without
Language: English
Price: $151.00
imgalt
Building materials. Methods for combustibility test
Language: English
Price: $162.00
imgalt
Building materials spread flame test method
Language: English
Price: $147.00
imgalt
Polyvinyl chloride insulated cables of rated voltages up to and including 450/750 V. Non-sheathed cables for fixed wiring
Language: English
Price: $283.00
imgalt
Clear sheet glass. Specifications
Language: English
Price: $250.00
imgalt
Steel welded vessels and apparatus. General technical conditions
Language: English
Price: $549.00
imgalt
System of Standards for Occupational Safety and Health (SSBT). Personal protective equipment for respiratory organs. Self-rescuers insulating on chemically bound or with compressed oxygen. Technical requirements. Test methods. Marking. Sampling rules
Language: English
Price: $700.00
imgalt

YOUR ORDERING MADE EASY!

RussianGost.com is an industry-leading company with stringent quality control standards and our dedication to precision, reliability and accuracy are some of the reasons why some of the world’s largest companies trust us to provide their national regulatory framework and for translations of critical, challenging, and sensitive information.

Our niche specialty is the localization of national regulatory databases involving: technical norms, standards, and regulations; government laws, codes, and resolutions; as well as RF agency codes, requirements, and Instructions.

We maintain a database of over 220,000 normative documents in English and other languages for the following 12 countries: Armenia, Azerbaijan, Belarus, Kazakhstan, Kyrgyzstan, Moldova, Mongolia, Russia, Tajikistan, Turkmenistan, Ukraine, and Uzbekistan.

Placing Your Order

Please select your chosen document, proceed to the ‘checkout page’ and select the form of payment of your choice. We accept all major credit cards and bank wire transfers. We also accept PayPal and Google Checkout for your convenience. Please contact us for any additional arrangements (Contract agreements, PO, etc.).

Once an order is placed it will be verified and processed within a few hours up to a rare maximum of 24 hours.

For items in stock, the document/web link is e-mailed to you so that you can download and save it for your records.

For items out of stock (third party supply) you will be notified as to which items will require additional time to fulfil. We normally supply such items in less than three days.

Once an order is placed you will receive a receipt/invoice that can be filed for reporting and accounting purposes. This receipt can be easily saved and printed for your records.

Your Order Best Quality and Authenticity Guarantee

Your order is provided in electronic format (usually an Adobe Acrobat or MS Word).

We always guarantee the best quality for all of our products. If for any reason whatsoever you are not satisfied, we can conduct a completely FREE revision and edit of products you have purchased. Additionally we provide FREE regulatory updates if, for instance, the document has a newer version at the date of purchase.

We guarantee authenticity. Each document in English is verified against the original and official version. We only use official regulatory sources to make sure you have the most recent version of the document, all from reliable official sources.

All Codes and Regulations

All Categories

Send us a message Expand Collapse

Leave your message in the form below, and we will write back by e-mail!