OST

1986

OST 34-42-813-86
OST 34-42-813-86
Tanks and reservoirs for acid solutions and alkali with relative density more than 1 t/m3. Technical requirements.
OST 34-42-822-86
OST 34-42-822-86
Details and prefabricated units of TPS pipelines for an anticorrosion coating. Free steel flanges. Construction and dimensions.
OST 34-42-823-86
OST 34-42-823-86
Details and prefabricated units of TPS pipelines for an anticorrosion coating. Bevelled pipes with loose flanges. Construction and dimensions.
OST 34-42-824-86
OST 34-42-824-86
Details and prefabricated units of TPS pipelines for an anticorrosion coating. Internal flush-jointed welded tees with loose flanges. Construction and dimensions.
OST 34-42-825-86
OST 34-42-825-86
Details and prefabricated units of TPS pipelines for an anticorrosion coating. Transitional welded tees with loose flanges. Construction and dimensions.
OST 34-42-826-86
OST 34-42-826-86
Details and prefabricated units of TPS pipelines for an anticorrosion coating. Flat welded steel flanges. Construction and dimensions.
OST 34-42-827-86
OST 34-42-827-86
Details and prefabricated units of TPS pipelines for an anticorrosion coating. Straight pipe with welded flanges. Construction and dimensions.
OST 34-42-828-86
OST 34-42-828-86
Details and prefabricated units of TPS pipelines for an anticorrosion coating. Internal flush-jointed welded tees with welded flanges. Construction and dimensions.
OST 34-42-829-86
OST 34-42-829-86
Details and prefabricated units of TPS pipelines for an anticorrosion coating. Transitional welded tees with flanges. Construction and dimensions.
OST 34-42-830-86
OST 34-42-830-86
Details and prefabricated units of TPS pipelines for an anticorrosion coating. Transitions with welded flanges. Construction and dimensions.
OST 34-42-831-86
OST 34-42-831-86
Details and prefabricated units of TPS pipelines for an anticorrosion coating. Welded branches with welded flanges. Construction and dimensions.
OST 34-42-832-86
OST 34-42-832-86
Details and prefabricated units of TPS pipelines for an anticorrosion coating. Knuckled branches with welded flanges. Construction and dimensions.
OST 34-42-833-86
OST 34-42-833-86
Details and prefabricated units of TPS pipelines for an anticorrosion coating. Flat caps. Construction and dimensions.
OST 34-42-834-86
OST 34-42-834-86
Details and prefabricated units of TPS pipelines for an anticorrosion coating. Flange connections chamber measuring diaphragms. Construction and dimensions.
OST 34-42-835-86
OST 34-42-835-86
Details and prefabricated units of TPS pipelines for an anticorrosion coating. General technical requirements.
OST 34-42-836-86
OST 34-42-836-86
Flat Flanges for pipes of TPP and NPP. Design and dimensions.
Price: $118.00
OST 34-42-840-86
OST 34-42-840-86
Organization of assembly works in nuclear thermal power plants of ВВЭР-1000 type. Assembly of thermal and mechanical equipment. Main provisions.
OST 34-42-841-86
OST 34-42-841-86
Organization of assembly works in nuclear thermal power plants. Assembly of thermal and mechanical equipment in nuclear thermal power plants with ВВЭР-1000 reactors. General technical requirements.
OST 3-4433-86
OST 3-4433-86
Lenses for photographic enlargers. Methods of measurement
OST 3-4434-86
OST 3-4434-86
Projection lenses. The visual method for determining the resolution
OST 3-4435-86
OST 3-4435-86
Optical Consumer goods. The construction, presentation, design and matching the servicing manual.
OST 3-4436-86
OST 3-4436-86
Overhead projectors. Types, basic dimensions
OST 34-43-775-86
OST 34-43-775-86
Organization of assembly works in nuclear thermal power plants. Technical documentation regarding assembly of electrical equipment, cable electric power lines, automation equipment and control systems. Requirements for documentation on operational management and quality control of installation and wiring works.
OST 34-43-776-86
OST 34-43-776-86
Organization of assembly works in nuclear thermal power plants. Technical documentation regarding assembly of electrical equipment, cable electric power lines, automation equipment and control systems. Requirements for preproduction documentation.
OST 34-43-777-86
OST 34-43-777-86
Organization of assembly works in nuclear thermal power plants. Technical documentation regarding assembly of electrical equipment, cable electric power lines, automation equipment and control systems. Requirements for initial check quality documentation.
OST 34-43-780-86
OST 34-43-780-86
Organization of assembly works in nuclear thermal power plants. Technical documentation regarding assembly of electrical equipment, cable electric power lines, automation equipment and control systems. Main provisions.
OST 3-4437-86
OST 3-4437-86
Slide projectors. Requirements to the quality of refurbished products
OST 3-4438-86
OST 3-4438-86
infrared magnet polarimeters and magnet polarimeteric plates. Technical requirements.
OST 3-4439-86
OST 3-4439-86
Consumer services for the population. Refurbished amateur filming devices and projectors. General technical conditions
OST 3-4440-86
OST 3-4440-86
Consumer services for the population. Refurbished photo cameras. General technical conditions
OST 3-4441-86
OST 3-4441-86
Amateur Photo cinematographic equipment. Requirements to maintainability.
OST 34-70-539-86
OST 34-70-539-86
Sampling instrument for sampling of solid fuel from flows. General specifications.
OST 34-70-821-86
OST 34-70-821-86
Order of workers and engineers provision with individual protection equipment, issue, usage, operation and care.
OST 34-70-915-86
OST 34-70-915-86
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Warranty tests.
OST 34-70-916-86
OST 34-70-916-86
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Hook-up and commissioning works organization. Acceptance regulations for equipment and hook-up and commissioning performance systems.
OST 34-71-839-86
OST 34-71-839-86
Wooden parts of poles of overhead power transmission lines. General Specifications.
OST 34-9-837-86
OST 34-9-837-86
Site selection for nuclear power plants, nuclear cogeneration plants and nuclear heating plants. Requirements for the content, scope and documentation execution.
OST 34-9-917-86
OST 34-9-917-86
Design documentation. Customer request and informational supplier proposal on nuclear thermal power plant construction technical supporting assistance. Document content and execution requirements.
OST 35-03-86
OST 35-03-86
General specifications for Mintransstroy engineering products.
OST 3-5093-86
OST 3-5093-86
Active elements made of crystals by activated neodymium for solid-state lasers. Methods for calculating ratio of total optical losses and attenuation rate.
OST 3-5095-86
OST 3-5095-86
Complex gauges for splined square-sided joints. Production dimensions.
OST 35-09-86
OST 35-09-86
Hoisting machinery and equipment. General specifications.
OST 3-5101-86
OST 3-5101-86
Machining on robotic technology complexes. Requirements for operations removal and installation of details.
OST 35-11-86
OST 35-11-86
Occupational safety standards system. Laying of upper structure of railway truck. Safety requirements.
OST 3-5203-86
OST 3-5203-86
Profile products ГОС-1. Test methods for tightness by measuring the difference in pressure.
OST 35-26.0-86
OST 35-26.0-86
Ceramsite concrete room units for transport construction. General technical requirements.
OST 35-26.1-86
OST 35-26.1-86
Ceramsite concrete thin-walled room units for transport construction. Technical requirements.
OST 35-26.2-86
OST 35-26.2-86
Ceramsite concrete thick-walled room units for transport construction. Technical requirements.

All Codes and Regulations

All Categories

Send us a message Expand Collapse

Leave your message in the form below, and we will write back by e-mail!