MR

1996

MRR 3.1.12-96
MRR 3.1.12-96
Standards for Development Timeframe for Preliminary Urban Planning and Predesign Documentation for Construction in the City of Moscow and the Greenbelt
Price: $179.19
MRR 3.1.13-96
MRR 3.1.13-96
Compendium of Base Prices for the Preparation of Predesign Documentation for Construction in the City of Moscow and the Greenbelt
Price: $679.14
MRR 3.2.03-96
MRR 3.2.03-96
Procedure for Determining the Cost of Preliminary Urban Planning Documentation
Price: $539.55
MRR 3.2.05-96
MRR 3.2.05-96
Procedure for Determining the Cost of Technical Inspection of Building Components of Buildings and Structures
MRR 3.2.06-96
MRR 3.2.06-96
The procedure for determining the cost of design work for construction in Moscow and LPZP (2nd edition) (as amended on May 6, 1998) (invalidated by order of the Mayor of Moscow dated April 5, 1999 N 294-RM)
MRR 3.2.09-96
MRR 3.2.09-96
Procedure for Determining the Cost of Work Related to Approval of Pre-Design and Design Documentation for Construction in the City of Moscow and the Greenbelt
MRR 3.2.16-96
MRR 3.2.16-96
Procedure for Determining the Cost of Preparing Predesign Documentation

All Codes and Regulations

All Categories

Send us a message Expand Collapse

Leave your message in the form below, and we will write back by e-mail!