OST

OST 34-37-790-85
OST 34-37-790-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Personnel qualification requirements. Personnel certification.
Price: $229.00
OST 34-37-791-85
OST 34-37-791-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Volume and sequence of hook-up and commissioning works. General provisions.
OST 34-37-792-85
OST 34-37-792-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Volume and sequence of hook-up and commissioning works. Hydraulic testing and 1st circuit washing.
Price: $134.00
OST 34-37-793-85
OST 34-37-793-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Volume and sequence of hook-up and commissioning works. First inspection of nuclear steam generating plant main equipment.
Price: $134.00
OST 34-37-794-85
OST 34-37-794-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Volume and sequence of hook-up and commissioning works. Nuclear steam generating plant running in.
OST 34-37-795-85
OST 34-37-795-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Volume and sequence of hook-up and commissioning works. Second inspection of nuclear steam generating plant main equipment.
Price: $134.00
OST 34-37-796-85
OST 34-37-796-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Volume and sequence of hook-up and commissioning works. First criticality.
Price: $197.00
OST 34-37-797-85
OST 34-37-797-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Volume and sequence of hook-up and commissioning works. Power start-up and unit designed capacity adaptation.
Price: $134.00
OST 34-37-798-85
OST 34-37-798-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. General specifications for equipment and systems testing.
Price: $134.00
OST 34-37-799-85
OST 34-37-799-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Terms and definitions. Technical documentation. General requirements.
Price: $86.00
OST 34-37-800-85
OST 34-37-800-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Terms and definitions. Technical documentation. Requirements for content of “Program and testing methods” document.
Price: $118.00
OST 34-37-801-85
OST 34-37-801-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Terms and definitions. Requirements for instruments, materials and equipment for hook-up and commissioning works.
Price: $118.00
OST 34-37-802-85
OST 34-37-802-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Terms and definitions. Technical documentation. Requirements for manufacturing systems operation.
Price: $197.00
OST 34-37-803-85
OST 34-37-803-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Terms and definitions. Technical documentation. Requirements for content of commissioning personnel real-time documentation.
Price: $118.00
OST 34-37-804-85
OST 34-37-804-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Reporting documentation. Certificates of work completion at separate stages of hook-up and commissioning works.
Price: $181.00
OST 34-37-805-85
OST 34-37-805-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Reporting documentation. Unit acceptance for operation certificate.
Price: $260.00
OST 34-37-806-85
OST 34-37-806-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Reporting documentation. Equipment acceptance certificates.
Price: $260.00
OST 34-37-807-85
OST 34-37-807-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Reporting documentation. Hook-up and commissioning works log.
Price: $197.00
OST 34-37-808-85
OST 34-37-808-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Reporting documentation. Certificates on unit readiness for separate stages of hook-up and commissioning works.
Price: $197.00
OST 34-37-809-85
OST 34-37-809-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Reporting documentation. General provisions.
Price: $134.00
OST 34-37-810-85
OST 34-37-810-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Reporting documentation. Requirements for hook-up and commissioning works completion reports.
Price: $197.00
OST 34-37-811-85
OST 34-37-811-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Terms and definitions. Technical documentation. Process flow diagrams.
Price: $260.00
OST 34-37-812-85
OST 34-37-812-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Terms and definitions. Technical documentation. Equipment operating instructions requirements.
OST 34-37-814-85
OST 34-37-814-85
Diesel-powered stand-by plants for nuclear thermal power plants. Technical requirements.
OST 34-38-702-85
OST 34-38-702-85
Maintenance and repair system of power stations equipment. Basic concepts for nuclear power plant. Terms and definitions.
OST 34-38-770-85
OST 34-38-770-85
Power plant maintenance systems. Requirements to source information for ensuring of maintainability at development of equipment of nuclear power stations. General provisions.
OST 34-38-772-85
OST 34-38-772-85
Maintenance and repair system of power station equipment. Assessment of maintainability during development of equipment for nuclear power plant. General provisions.
OST 3-4424-85
OST 3-4424-85
Slide projector. The standard form of technical conditions
OST 3-4425-85
OST 3-4425-85
Camera. The standard form of technical conditions
OST 3-4426-85
OST 3-4426-85
Amateur film projector. The standard form of technical conditions
OST 34-42-699-85
OST 34-42-699-85
Steel seamless details of pipelines for working P 2.2 MPa (22 kg/cm2) for nuclear and thermal power plants. Knuckled bends. Construction and dimensions.
OST 34-42-700-85
OST 34-42-700-85
Steel seamless welded details of pipelines for working pressure P<2.2 MPa for nuclear and thermal power plants. Transitions. Construction and dimensions.
OST 34-42-701-85
OST 34-42-701-85
Steel seamless welded details of pipelines for working pressure P<2.2 MPa for nuclear and thermal power plants. Technical conditions.
OST 34-42-723-85
OST 34-42-723-85
Assembling units and station pipelines hang details of CHP plant, nuclear thermal power plant and dust-and-gas windpipes of TES. Types and main parameters.
OST 34-42-724-85
OST 34-42-724-85
Welded suspension unit for horizontal pipelines. Design and dimensions.
OST 34-42-725-85
OST 34-42-725-85
Loop suspension unit for horizontal pipelines. Design and dimensions.
OST 34-42-726-85
OST 34-42-726-85
Suspension unit with supporting beam. Design and dimensions.
OST 34-42-727-85
OST 34-42-727-85
Welded suspension unit for vertical pipelines. Design and dimensions.
OST 34-42-728-85
OST 34-42-728-85
Loop suspension unit for vertical pipelines. Design and dimensions.
OST 34-42-729-85
OST 34-42-729-85
Suspension unit with lug. Design and dimensions.
OST 34-42-730-85
OST 34-42-730-85
Suspension unit with eye bar. Design and dimensions.
OST 34-42-731-85
OST 34-42-731-85
Suspension unit with fin. Design and dimensions.
OST 34-42-732-85
OST 34-42-732-85
Suspension unit with cross head. Design and dimensions.
OST 34-42-733-85
OST 34-42-733-85
Lug with lining. Design and dimensions.
OST 34-42-734-85
OST 34-42-734-85
Fin with cover plate. Design and dimensions.
OST 34-42-735-85
OST 34-42-735-85
Clip for horizontal pipelines. Design and dimensions.
OST 34-42-736-85
OST 34-42-736-85
Clip for vertical pipelines. Design and dimensions.
OST 34-42-737-85
OST 34-42-737-85
Supporting beams. Design and dimensions.

All Codes and Regulations

All Categories

Send us a message Expand Collapse

Leave your message in the form below, and we will write back by e-mail!