RD

RD 34.17.424-87
RD 34.17.424-87
Guidelines for Investigating Causes of Damage to Metal of the Blade Apparatus and Steam Turbine Disks
RD 34.20.102-87
RD 34.20.102-87
Guide to Selection and Review of Routes for 35-1150 kV Overhead Electric Power Transmission Lines
RD 34.20.327-87
RD 34.20.327-87
Procedural Guidelines for Hydropneumatic Flushing of Piped Hot Water Heat Supply Networks
Price: $295.00
RD 34.20.407-87
RD 34.20.407-87
Rules of acceptance for operation of the construction of distributive electrical networks with voltage of 0.38–20 kV for agricultural purposes
Price: $199.00
RD 34.20.517-87
RD 34.20.517-87
Guidelines for preventing ferroresonance in 110 - 500 kV switchgears with electromagnetic voltage transformers and circuit breakers containing capacitive voltage dividers
RD 34.20.543-87
RD 34.20.543-87
Guidelines for calculating and accounting for power plant capacity limitations
Price: $167.00
RD 34.20.547-87
RD 34.20.547-87
Method of calculating the limit current loads on the conditions of heating wires for existing power lines
RD 34.20.566-87
RD 34.20.566-87
Typical instruction for the elimination of violations in the operation of distribution electric networks 0.38 - 20 kV with overhead power lines
RD 34.20.663-87
RD 34.20.663-87
Standard instruction for work under voltage on intermediate supports and in the spans of overhead power transmission lines with voltage of 220 - 750 kV
RD 34.21.122-87
RD 34.21.122-87
Manual for installation of the lightning protection of buildings and structures
Price: $646.00
RD 34.21.122-87 Manual
RD 34.21.122-87 Manual
Manual for Guidelines for installation of lightning protection systems for buildings and structures
Price: $231.00
RD 34.21.122-87 Supplement
RD 34.21.122-87 Supplement
Manual to the Instructions for the installation of lightning protection of buildings and structures
Price: $194.97
RD 34.22.501-87
RD 34.22.501-87
Guidelines for preventing the formation of mineral and organic deposits in turbine condensers and their cleaning
Price: $662.00
RD 34.23.504-87
RD 34.23.504-87
Model Guidelines for Operation of Solid Fuel Sampling and Dressing Machines at Electric Power Generating Stations
Price: $550.00
RD 34.25.101-87
RD 34.25.101-87
Power Units with Turbines T-180/210-310 and K-215-130 and Drum Boilers -Standard Startup Process
RD 34.25.102-87
RD 34.25.102-87
Cogeneration monobloc unit with turbine T-110/120-130 and drum boiler. Typical starting connection
Price: $279.00
RD 34.25.103-87
RD 34.25.103-87
Two-Boiler, Single-Turbine Unit with Turbine T-185/220-130 and Drum Boilers. Standard Startup Process
RD 34.30.302-87
RD 34.30.302-87
Guidelines for the commissioning and operation of steam jet ejectors of condensing installations of TPP and NPP
Price: $646.00
RD 34.35.113-87
RD 34.35.113-87
Guidelines for emergency automation of power systems. Key Points
RD 34.37.306-87
RD 34.37.306-87
Guidelines for monitoring the state of the main equipment of thermal power plants, determining the quality and chemical composition of deposits
RD 34.37.307-87
RD 34.37.307-87
Procedural Guidelines for Predicting Chemical Composition and Scale-Forming Properties of Electric Power Generating Station Coolant Water
Price: $327.00
RD 34.39.301-87
RD 34.39.301-87
Procedural Guidelines for Monitoring Thermal Expansion of Steam Lines in Thermal Power Stations
Price: $375.00
RD 34.46.601-87
RD 34.46.601-87
Power oil transformers. The method of heating by currents of zero sequence
RD 34.48.151-87
RD 34.48.151-87
Engineering Design Standards for Dispatch Centers and Dispatch and Process Control System Assemblies in Energy Systems
RD 34.48.152-87
RD 34.48.152-87
Guidelines for the design of the power supply of technical means of dispatching and technological control
RD 34.48.510-87
RD 34.48.510-87
Basic Principles for the Automated Process Telephone System of the Minenergo USSR
Price: $773.00
RD 34.49.101-87
RD 34.49.101-87
Design Guidelines for Fire Protection for Energy Facilities
Price: $423.00
RD 34-15-3-87
RD 34-15-3-87
Concrete work during the construction of rolled concrete structures
RD 39-0137095-003-87
RD 39-0137095-003-87
Automation and telemechanization of main oil pipelines when creating unmanned technology
RD 39-0147009-23-87
RD 39-0147009-23-87
Uniform rules for maintenance work in wells
RD 39-0147009-531-87
RD 39-0147009-531-87
Classification for Well Workover Operations
RD 39-0147009-534-87
RD 39-0147009-534-87
Well cementing control technology using phase correlation chart recorders (Volna, BFKA ...)
RD 39-0147009-544-87
RD 39-0147009-544-87
Well control technology for gas and oil showings in various geological conditions
RD 39-0147009-711-87
RD 39-0147009-711-87
Instructions on the technology of application of heat-resistant chemicals for cement slurries
RD 39-0147014-535-87
RD 39-0147014-535-87
Instructions for welding at installation and repair of pipelines and critical metal structures in organizations and enterprises of the Ministry of oil and gas industry.
RD 39-0147014-536-87
RD 39-0147014-536-87
Guidance Document. Regulations on the organization of welding production at enterprises and organizations of the Ministry of Oil Industry
RD 39-0147035-202-87
RD 39-0147035-202-87
Guidelines for conducting geological field analysis of the development of oil and gas fields
RD 39-0147035-203-87
RD 39-0147035-203-87
Procedural Guidelines for Designers for Supervision of Implementation of Designs and Process Solutions for Development of Oil Fields and Oil-Gas Fields
RD 39-0147035-205-87
RD 39-0147035-205-87
Process Guidelines for Restricting Water Inflow and Increasing Crude Oil Recovery Using Multi-Component Foam Based on Sulfate (Monosulfate) Black Liquor
RD 39-0147035-209-87
RD 39-0147035-209-87
Methodological Guidelines for Determining the Technological Efficiency of Hydrodynamic Methods for Enhancing Oil Recovery
RD 39-0147035-229-87-R
RD 39-0147035-229-87-R
Method of restriction of produced water at oil fields, which entered the late stage of development
RD 39-0147103-378-87
RD 39-0147103-378-87
Guidelines for Repair of Prestressed Reinforced Concrete Cylindrical Petroleum Tanks
RD 39-0147103-385-87
RD 39-0147103-385-87
Rules for technical operation of reservoirs of trunk pipelines. Guidance Document
RD 39-0147103-386-87
RD 39-0147103-386-87
The choice of the calculated values of the thermal conductivity of the soil in the design of pipelines
RD 39-0147103-387-87
RD 39-0147103-387-87
Method for determining the crack resistance of oil pipe material
RD 39-0147103-388-87
RD 39-0147103-388-87
Methodical instructions for determining the technological losses of oil at the enterprises of the Ministry of Petroleum Industry
RD 39-0147103-390-87
RD 39-0147103-390-87
Guidelines. Flow vibration meter. Method of verification
RD 39-0147103-391-87
RD 39-0147103-391-87
Guidelines. Flow vibration meter. Methods for verifying the reliability of testimony under operating conditions

All Codes and Regulations

All Categories

Send us a message Expand Collapse

Leave your message in the form below, and we will write back by e-mail!