Home
Translation
Regulatory
Distributors
Terms
About Us
Contact
More Search Options testing
Login
My Account
Shopping Cart (0)
Your shopping cart is empty.
0
saved
Now In:
Other norms
Documents by Year
1930s (71)
1930 (5)
1931 (6)
1932 (9)
1933 (6)
1934 (6)
1935 (4)
1936 (12)
1937 (8)
1938 (3)
1939 (12)
1940s (38)
1940 (4)
1941 (4)
1942 (3)
1943 (9)
1944 (2)
1945 (1)
1946 (7)
1947 (6)
1948 (1)
1949 (1)
1950s (112)
1951 (5)
1952 (14)
1953 (18)
1954 (12)
1955 (21)
1956 (22)
1957 (3)
1958 (4)
1959 (13)
1960s (281)
1960 (7)
1961 (35)
1962 (45)
1963 (49)
1964 (14)
1965 (26)
1966 (19)
1967 (21)
1968 (35)
1969 (30)
1970s (228)
1970 (19)
1971 (13)
1972 (9)
1973 (8)
1974 (30)
1975 (40)
1976 (37)
1977 (24)
1978 (18)
1979 (30)
1980s (1104)
1980 (37)
1981 (53)
1982 (45)
1983 (119)
1984 (110)
1985 (165)
1986 (148)
1987 (214)
1988 (109)
1989 (104)
1990s (1022)
1990 (134)
1991 (210)
1992 (48)
1993 (84)
1994 (57)
1995 (39)
1996 (33)
1997 (41)
1998 (102)
1999 (274)
2000s (10458)
2000 (389)
2001 (2234)
2002 (534)
2003 (610)
2004 (585)
2005 (864)
2006 (1117)
2007 (1264)
2008 (1329)
2009 (1532)
2010s (18476)
2010 (1832)
2011 (2518)
2012 (2429)
2013 (3269)
2014 (2707)
2015 (3332)
2016 (1664)
2017 (256)
2018 (219)
2019 (250)
2020s (367)
2020 (367)
Other (967)
Other norms
«
1
2
3
»
GKINP 11-157-88
Guide to topographic surveys of the shelf and inland waters
GKINP 11-218-88
Basic provisions for creating topographic maps of the shelf and inland waters
GKINP 14-221-88
Instructions on the procedure for drawing up and publishing plans for cities and other settlements intended for open publication and marked "for official use" (LNG-88)
GMV 42-21-26-88
Industry Guidelines. Department of hyperbaric oxygenation. Rules of organization and operation
ITP 50-88
Instructions for the technological design of enterprises of the salt industry / stone processing and the production of vacuum-evaporated salt /
Methodical instructions 4550-88
Methodical instructions for determining the levels of electromagnetic field of civil aviation air traffic control facilities of HF-, VHF-, UHF- and UHF-bands
Model project 291-8-24s.88
Album 2 Part 2 Metal structures
Model project 291-8-24s.88
Album 3 Part 1 Heating and ventilation. Internal water supply and sewerage. Communication and signaling. Fire alarm
Model project 291-8-24s.88
Album 3 Part 2 Electrical equipment. Automation of heating and ventilation systems
Model project 291-8-24s.88
Sports and recreation center (in light metal structures) (FOK-1-s). Seismicity 7, 8, 9 points. The walls are made of three-layer metal panels. Volume 20 469 m3
Model project 501-9-036.88
Mechanized processing stations for 50 and 150 large-tonnage containers per day
Model project 813-2-49.88
Album I. General explanatory note. Production technology. Cold supply. Automation of technological processes. Power equipment. Electric lighting. Communication and signaling
Model project 813-2-49.88
Album II. Architectural solutions. Reinforced concrete structures. Wooden constructions. Heating, ventilation and air conditioning. Internal water supply and sewerage
Model project 813-2-49.88
Album III. Building products
Model project 813-2-49.88
Album IV. Hardware specifications
Model project 813-2-49.88
Album V. Part 1. Estimates
Model project 813-2-49.88
Album V. Part 2. Estimates
Model project 813-2-49.88
Album VI. Material requirement lists
Model project 813-2-49.88
Storage for food carrots (refrigerated) with a capacity of 1000 tons
Model project 902-1-146.1.88
Sewage pumping station with capacity of 120-660 cubic meters/hour, head 6-51 m at a depth of the supplying collector 7.0 m (prefabricated-monolithic version)
Model project 902-1-146.1.88
Sewage pumping station capacity of 120-660 cubic meters / h, the head 6-51 m at a depth of upstream collector 7.0 m (precast-monolithic version). Appendix 1 Explanatory note (from T.P. 902-1-142.88)
Model project 902-1-146.1.88
Sewage pumping station with capacity of 120-660 cubic meters/hour, head of 6-51 m at a depth of the supplying collector of 7.0 m (prefabricated-monolithic version). Multifunctional complex with a water-supply and sewage disposal system. Internal water supply and sewage systems. Heating and ventilation (from T.P. 902-1-142.88)
Model project 902-1-146.1.88
Sewage pumping station with capacity of 120-660 cubic meters/hour, head 6-51 m at a depth of the supplying collector 7.0 m (prefabricated-monolithic version). General drawings. Architectural solutions. Reinforced Concrete Structures. Structures of metal (from T.P. 902-1-142.88)
Model project 902-1-146.1.88
Sewage pumping station with a capacity of 120-660 cubic meters/hour, head 6-51 m at a depth of the supplying collector 7.0 m (prefabricated-monolithic version). Tab. 4 Products (from T.P. 902-1-142.88)
Model project 902-1-146.1.88
Sewage pumping station with capacity of 120-660 cubic meters/hour, head 6-51 m at a depth of the supplying collector 7.0 m (prefabricated-monolithic version). Construction of reinforced concrete structures. Reinforced Concrete Structures. Metallic structures. Products .
Model project 902-1-146.1.88
Sewage pumping station with a capacity of 120-660 cubic meters/hour, head 6-51 m at a depth of the supplying collector 7.0 m (prefabricated-monolithic version). Standard Book 6 Power Electrical Equipment. Technological control (from T.P. 902-1-142.88)
Model project 902-1-146.1.88
Sewage pumping station with capacity of 120-660 cubic meters/hour, head 6-51 m at a depth of the supplying collector 7.0 m (prefabricated monolithic version). Standardized equipment (from T.P. 902-1-142.88)
Model project 902-1-146.1.88
Sewage pumping station with capacity of 120-660 cubic meters/hour, head 6-51 m at a depth of the supply collector 7.0 m (prefabricated-monolithic version). Tab. 8 Equipment specification (from T.P. 902-1-142.88)
Model project 902-1-146.1.88
Sewage pumping station with capacity of 120-660 cubic meters/hour, head 6-51 m at a depth of the supply sewer 7.0 m (prefabricated-monolithic version). Tab. 9.1 Material Requirements List
Model project 902-1-146.1.88
Sewage pumping station with capacity of 120-660 cubic meters/hour, head 6-51 m at a depth of the supplying collector 7.0 m (prefabricated-monolithic version). Alb.10 Estimates. General part (from T.P. 902-1-142.88)
Model project 902-1-146.1.88
Sewage pumping station with capacity of 120-660 cubic meters/hour, head 6-51 m at a depth of the supplying collector 7.0 m (prefabricated-monolithic version). Addendum 11.1 to the Bill of Quantities. Underground part.
Model project 902-1-146.2.88
Appendix 1 Explanatory note (from T.P. 902-1-142.88)
Model project 902-1-146.2.88
Album 2 Production technology. Internal water supply and sewerage. Heating and ventilation (from T.P. 902-1-142.88)
Model project 902-1-146.2.88
Album 3 General drawings. Architectural solutions. Reinforced Concrete Structures. Metal structures (from T.P. 902-1-142.88)
Model project 902-1-146.2.88
Album 4 Products (from T.P. 902-1-142.88)
Model project 902-1-146.2.88
Albom 5.2 Underground part. Concrete structures. Structures of metal. Products
Model project 902-1-146.2.88
Tab. 6 Power electrical equipment. Technological control (from T.P. 902-1-142.88)
Model project 902-1-146.2.88
Standardized equipment (from T.P. 902-1-142.88)
Model project 902-1-146.2.88
Equipment specification (from T.P. 902-1-142.88)
Model project 902-1-146.2.88
Material Requirements Sheet 9.2
Model project 902-1-146.2.88
Alphabet 10 Estimates. General part (from T.P. 902-1-142.88)
Model project 902-1-146.2.88
Sewage pumping station with capacity of 120-660 m3/h, head 6-51 m at a depth of the supply sewer 7.0 m ("prefabricated wall in the ground")
Norms 24-88
All-union norms on defensive relations for a television broadcasting system
Price:
$87.00
Norms 2-88
All-Union norms of permissible industrial radio interference. Electric transport. Valid Values Test methods
Price:
$87.00
NTPS 88
Engineering Design Standards for Power Grids and Substations
OMU 42-21-26-88
Departments of hyperbaric oxygenation, rules of operation and repair
OMU 42-21-27-88
Hyperbaric oxygenation devices. Operation and repair rules
OPV 88
General Explosion Safety Requirements for Explosion-Hazardous Chemical, Petrochemical, and Petroleum Refining Processes
«
1
2
3
»
All Codes and Regulations
Codes
MGSN
OND
PR
SNiP
TU
Decisions
MI
ONTP
PUE
SN
VNTP
Decrees
MR
Orders
RD
SO
VPPB
GN
MSN
OST
RDS
SP
VRD
GOST
MSP
Other norms
Resolutions
ST SEV
VSN
Instructions
MUK
PB
RMU
STO
Laws
MU
PNAE
R
TI
Letters
ND
PND
RSN
TOI
MDK
NPB
POT
RTM
TR EAES
MDS
NP
PPB
SanPiN
TSN
All Categories
Construction (Max)
Highways (Max)
National Standards for KGS (State Standards Classification)
Power industry
Standards for pipe fittings (TPA)
Construction Price Formation
ISO classifier
National Standards for OKSTU
Projects of works (PPR) on bridges
Technical Supervision
Evidence base (TR CU, Technical Regulation of the Customs Union)
National standards
Organization Standards
PromExpert
Welding regulations
Send us a message
Leave your message in the form below, and we will write back by e-mail!
Please enter your message!
Please enter your email!
Please enter valid email!
Please enter captcha!
Invalid captcha!