Other norms

GKINP 01-014-92
GKINP 01-014-92
Instructions for compiling and publishing catalogs of geodetic points
IN 4-7-92
IN 4-7-92
Index of regulatory and technical documents (as of 01.03.92)
Model project 704-2-65.92
Model project 704-2-65.92
Oil product warehouse with a capacity of 40 cubic meters. m for collective farms and state farms (aerial version)
Model project 704-2-65.92
Model project 704-2-65.92
Oil product warehouse with a capacity of 40 cubic meters. m for collective farms and state farms (aerial version)
Model project 709-3-3sp.92
Model project 709-3-3sp.92
Operational mechanized raw cotton warehouse with a capacity of 1,500 tons
Model project 709-3-3sp.92
Model project 709-3-3sp.92
Album 1. Explanatory note. Production technology. Architectural and construction solutions. Internal water supply and sewerage. Electric lighting and power electrical equipment. Process Automation
Model project 709-3-3sp.92
Model project 709-3-3sp.92
Album 2. Building products
Model project 709-3-3sp.92
Model project 709-3-3sp.92
Album 3. Hardware Specifications
Model project 709-3-3sp.92
Model project 709-3-3sp.92
Album 4. Estimates
Model project 709-3-3sp.92
Model project 709-3-3sp.92
Album 5. Bulletin material requirements
Model project 709-3-3sp.92
Model project 709-3-3sp.92
Operational mechanized raw cotton warehouse with a capacity of 1,500 tons
Model project 709-3-3sp.92
Model project 709-3-3sp.92
Album 1. Explanatory note. Production technology. Architectural and construction solutions. Internal water supply and sewerage. Electric lighting and power electrical equipment. Process Automation
Model project 709-3-3sp.92
Model project 709-3-3sp.92
Album 2. Building products
Model project 709-3-3sp.92
Model project 709-3-3sp.92
Album 3. Hardware Specifications
Model project 709-3-3sp.92
Model project 709-3-3sp.92
Album 4. Estimates
Model project 709-3-3sp.92
Model project 709-3-3sp.92
Album 5. Bulletin material requirements
NTS 63-92
NTS 63-92
Normals of heating networks. Reference materials for the design and construction of local heating stations and subscriber inputs
OTU 2-92
OTU 2-92
Vessels and apparatuses. General specifications for the repair of buildings
PB 13-01-92
PB 13-01-92
Uniform safety rules for blasting
PGVU 021-92
PGVU 021-92
Unified dust and air duct elements. Welded assemblies of blocks and elements of ducts of dust and gas air ducts of thermal power plants. Design and dimensions
PGVU 136-92
PGVU 136-92
Unified dust and air duct elements. Rigging details. Design and dimensions. Technical requirements
PGVU 242-92
PGVU 242-92
Round lens compensators for gas and air ducts (DN 200 - 6000 mm). Round single-lens compensator for gas and air ducts
PGVU 243-92
PGVU 243-92
Round lens compensators for gas and air ducts (DN 200 - 6000 mm). Round double compensator for gas and air ducts
PGVU 244-92
PGVU 244-92
Round lens compensators for gas and air ducts (DN 200 - 6000 mm). Three-way round compensator for gas and air ducts
PGVU 245-92
PGVU 245-92
Round lens compensators for gas and air ducts (DN 200 - 6000 mm). Four-sided round compensator for gas and air ducts
PGVU 246-92
PGVU 246-92
Compensator, rectangular single lens for gas and air ducts
PGVU 247-92
PGVU 247-92
Compensator, rectangular two-lens for gas and air ducts
PGVU 248-92
PGVU 248-92
Three-slip rectangular compensator for gas and air ducts
PGVU 249-92
PGVU 249-92
Four-sided rectangular compensator for gas and air ducts
PVSR 92
PVSR 92
Temporary regulations on the procedure for issuing certificates-permits for a special type of radioactive substance, for the design and transportation of packages with radioactive substances
RTs-AP33.74/92
RTs-AP33.74/92
Continued rotation of the gas turbine engine and rotor locking
STK 4-25-92
STK 4-25-92
Units and details of the supporting and supporting structures of electrical and pipe wiring. Part 3. Connection of trays LMT and LMTK
STK 4-26-92
STK 4-26-92
Protective pipelines of automation and industrial communications
STK 4-28-92
STK 4-28-92
Pipe wiring automation systems. Heating and heat insulation
STM 4-10-92
STM 4-10-92
Instruments for measuring and regulating pressure, flow and level. Part 1. Single installation in insulated heated cabinets
STM 4-13-92
STM 4-13-92
Devices and auxiliary devices. Installation methods on the facades of boards and consoles. Measuring instruments and regulators of pressure, dilution, flow and level
STM 4-16-92
STM 4-16-92
Devices and auxiliary devices. Installation methods on the facades of boards and regulators
STM 4-25-92
STM 4-25-92
Methods of installation of supporting and supporting structures of electrical and pipe wiring. Part 2. Box
STM 4-26-92
STM 4-26-92
Protective pipelines for automation and industrial communications. Part 2. Plastic pipelines
STM 4-28-92
STM 4-28-92
Pipe wiring automation systems. Heating and heat insulation
STM 4-5-92
STM 4-5-92
Instruments for measuring and regulating temperature. Installation on the wall and floor. Part 2
STM 4-8-92
STM 4-8-92
Mechanisms executive electric. Part 2. Joints with control valves and dampers
STN 51-4-92
STN 51-4-92
Construction of Underwater Crossings of Pipelines by Trenchless Method
Price: $570.24
SZK 4-4-92
SZK 4-4-92
Instruments for measuring and regulating the level. Installation on the tank. Part 3. Piezometric devices
SZK 4-7-92
SZK 4-7-92
Narrowing devices. Installation in the pipeline. Part 1. Diaphragm DKS, DFS
VSTP 6.01-92
VSTP 6.01-92
Sanitary requirements for the design of dairy enterprises
Zh3-92
Zh3-92
Recommendations for the use of Shch-K2 and Shch-K2M switchboards for DKVR boilers

All Codes and Regulations

All Categories

Send us a message Expand Collapse

Leave your message in the form below, and we will write back by e-mail!