Other norms

1997

DPN-1-03-97/100
DPN-1-03-97/100
Guide on safety examination of nuclear energy use installations. Steam turbine plant
Price: $167.00
DPN-1-07-97/100
DPN-1-07-97/100
Guide on safety examination of nuclear energy use installations. Radioactive waste handling
Price: $215.00
DPN-1-09-97/100
DPN-1-09-97/100
Guide on safety examination of nuclear energy use installations. Safety system
Price: $263.00
DPN-1-14-97/100
DPN-1-14-97/100
Guide on safety examination of nuclear energy use installations. Quality assurance
Price: $247.00
IM 14-55-97
IM 14-55-97
Automation systems for small heating boilers
KO 01.04.12-97
KO 01.04.12-97
Boilers
M-MVI-02-97
M-MVI-02-97
Methods for measuring the mass concentration of polychlorinated biphenyls in the working area air and industrial emissions using gas chromatography and mass chromatography
M-MVI-07-97
M-MVI-07-97
Gas chromatographic method for determining organic compounds in atmospheric air.
M-MVI-12-97
M-MVI-12-97
Measurement method for measuring the mass concentration of the sum of saturated hydrocarbons, carbon monoxide, sulfur dioxide and methane in the exhaust gases of fuel combustion plants using a gas monitor 1302.
M-MVI-19-97
M-MVI-19-97
The method for measuring the volume fraction of oxygen, the mass concentration of carbon monoxide, nitrous oxide and sulfur dioxide in the exhaust gases of fuel combustion plants using an MSI 150 Сompast analyzer.
M-MVI-23-97
M-MVI-23-97
Measurement technique for mercury content in alveolar condensate on an RA-915 atomic absorption spectrometer with RP-91 attachment.
MUK 4.4.001-97
MUK 4.4.001-97
Guidelines for the control of food products and food raw materials (the number of products in sampling for laboratory research and certification tests)
MVI 11-06-97
MVI 11-06-97
Methods for measuring the mass concentration of total iron in fresh natural water samples by the photometric method in flow-injection and flow modes on the flow-injection analyzer "PIA-Photo"
MVI 480-97
MVI 480-97
Method for performing measurements of the volume fraction of oxygen in gas calibration mixtures containing hydrogen, oxygen, argon, nitrogen, oxide and carbon dioxide
MVI 505-97
MVI 505-97
Method for performing measurements of the volume fraction of nitrogen in gas calibration mixtures containing hydrogen, oxygen, argon, nitrogen, methane, oxide and carbon dioxide
MVI 521-97
MVI 521-97
Method for measuring the content of the volume fraction of methane in gas calibration mixtures containing hydrogen, oxygen, argon, nitrogen, methane, oxide and carbon dioxide
MVI 523-97
MVI 523-97
Method for performing measurements of the content of the volume fraction of carbon monoxide in gas calibration mixtures containing hydrogen, oxygen, argon, nitrogen, methane, oxide and carbon dioxide
Norms 29-97
Norms 29-97
Electromagnetic compatibility of radio electronic means. Transmitting centers of radio communications, broadcasting and television, equipped with computer equipment. Electromagnetic environment parameters. Valid values. Measurement methods
Price: $135.00
Norms 31-97
Norms 31-97
Radiotelephone Extenders. Requirements for the parameters of electromagnetic compatibility. Test methods
Price: $199.00
OSN 3.02.01-97
OSN 3.02.01-97
Planning Code for Land Allocation for Railways
Price: $407.00
OTP.G.03.61.43-97
OTP.G.03.61.43-97
Complete transformer substation with a voltage of 10 / 0.4 kV with a capacity of 250, 400 and 630 kVA of the KTPG type with two cable inputs of 10 kV lines (Samara Electroshield Plant)
P 69-97/VNIIG
P 69-97/VNIIG
Guidance on methods for assessing the life and safety of concrete and reinforced concrete structures of hydraulic structures
P-69-97
P-69-97
Guidelines for assessing the life and safety of concrete and reinforced concrete structures of hydraulic structures
Price: $518.00
PMG 21-97
PMG 21-97
Non-destructive testing. Industrial sectors for purposes of certification of personnel
Price: $71.00
PMG 22-97
PMG 22-97
Rules for program planning of the development of interstate standards
PO 02.02.01.07-97
PO 02.02.01.07-97
Switches (switches) non-automatic, control buttons, electric energy meters
PPCh2-97
PPCh2-97
Re-binding drawings for channel-free laying of heat pipes in polyurethane foam insulation
R 3112194-0366-97
R 3112194-0366-97
Rates of consumption of fuels and lubricants in road transport (no longer valid)
RB-001-97
RB-001-97
Recommended Practice for More Thorough Safety Assessment of In-Service Reactors of Nuclear Power Plants With Water-Moderated Reactors and High-Power Boiling Waste Reactors
Price: $375.00
RB-002-97
RB-002-97
Water Chemistry at Nuclear Power Plants - Basic Safety Requirements
Price: $71.00
RP 1.311-1-97
RP 1.311-1-97
Design Guide. The order of development, coordination, approval and composition of project documentation for the construction of telecommunication facilities
Rules 00-97
Rules 00-97
Rules for Occupational Safety and Health in the Pulp and Paper and Forestry Industries (final)
STP 07.81-636-97
STP 07.81-636-97
Pipe fittings. Latches. The method of force calculation
STP 7.20.47-97
STP 7.20.47-97
Model for Design Development for Construction of Facilities, Buildings, and Structures. Section "Civil Defense Engineering Measures. Emergency Prevention Measures
TsTrt -14/97
TsTrt -14/97
Technical instructions for the preparation, operation and maintenance of diesel locomotives and diesel trains in winter conditions
Price: $407.00
TsV 2.04.49-97 «A», FR.1.31.2000.00135
TsV 2.04.49-97 «A», FR.1.31.2000.00135
Methods for measuring the mass concentration of ammonium nitrogen (ammonium ions) with Nessler's reagent photometric method in wastewater
TsV 2.04.49-97
TsV 2.04.49-97"A"
Methods for measuring the mass concentration of ammonium nitrogen with Nessler's reagent by photometric method in wastewater
Typical design solutions 501-0-97
Typical design solutions 501-0-97
Automatic route setting at separate points of the AUM-76 system. Album 1 Explanatory note
VNKR-97
VNKR-97
Instructions on the composition, procedure for the development, approval and approval of design estimates for the overhaul of buildings and structures of railway transport
Price: $502.00
VSP 103-97
VSP 103-97
Steel Fiber Reinforced Concrete Enclosures for Secure Spaces in Russian Federation Central Bank Facilities. Execution, Quality Control, and Acceptance Requirements
VSP 103-97 Bank of Russia
VSP 103-97 Bank of Russia
Steel-fiber-concrete fencing of protected premises of institutions of the Central Bank of the Russian Federation. Rules of production, quality control and acceptance
Price: $789.00

All Codes and Regulations

All Categories

Send us a message Expand Collapse

Leave your message in the form below, and we will write back by e-mail!