Other norms

Model project A-II,III,IV-150-236.83
Model project A-II,III,IV-150-236.83
Album 4 Heating, ventilation, internal water supply and sewerage. Power supply and low-current devices
Model project A-II,III,IV-150-236.83
Model project A-II,III,IV-150-236.83
Album 5 Custom Specifications
Model project A-II,III,IV-150-236.83
Model project A-II,III,IV-150-236.83
Free-standing warehouse of inventory and equipment, recessed from prefabricated blocks
Model project A-II,III,IV-150-236.83
Model project A-II,III,IV-150-236.83
Album 2 Architectural and building solutions
MUK 2913a-83
MUK 2913a-83
Price: $135.00
NR 34-70-32-83
NR 34-70-32-83
Spare parts consumption rates for equipment of systems for hydraulic and ash removal of thermal power plants
NVN 33-5.1.02-83
NVN 33-5.1.02-83
Instructions on the procedure for approval and issuance of permits for special water use
OPBZ-83
OPBZ-83
Basic safety and physical protection regulations for the transport of nuclear materials
OR BZ-83
OR BZ-83
Basic safety and physical protection regulations for the transport of nuclear materials.
Price: $741.00
P 09-83
P 09-83
Recommendations for the calculation of hydroabrasive wear of slurry pipelines and pumps for hydraulic ash removal systems at thermal power plants
Price: $902.00
P 09-83/VNIIG
P 09-83/VNIIG
Recommendations for calculating the hydroabrasive wear of slurry pipelines and pumps for hydraulic ash removal systems of thermal power plants
P 10-83
P 10-83
Recommendations for field observations and filtration studies in underground hydraulic structures
P 12-83
P 12-83
Recommended Practices for Laboratory Technique for Testing Soils for Water Permeability and Suffosion Resistance
P 780-83/Gidroproekt
P 780-83/Gidroproekt
Manual on the design of steel-reinforced concrete structures of hydraulic structures
P 795-83/Gidroproekt
P 795-83/Gidroproekt
Recommendations for taking into account the creep of concrete when determining the stress-strain state of concrete structures
P-780-83
P-780-83
Manual for design of waterworks composite structures
Price: $1,026.00
PDU 2666-83
PDU 2666-83
Ultimate Microwave Oven Flow Density Levels
RCZ-83
RCZ-83
Guidelines for centering and loading USSR civil aviation aircraft
RK 1104-83
RK 1104-83
Collectors with a section of 3.0 mx 3.2 m. Working drawings of products
RST RSFSR 267-83
RST RSFSR 267-83
Electric drives for household sewing machines repaired
RST RSFSR 272-83
RST RSFSR 272-83
Voltage stabilizers for household electronic equipment repaired
RST RSFSR 320-83
RST RSFSR 320-83
Half-smoked horse sausages. Technical conditions
RST RSFSR 322-83
RST RSFSR 322-83
Household sewing machines, renovated
RST RSFSR 376-83
RST RSFSR 376-83
Fresh corn on the cob of milky and milky-wax ripeness. Technical conditions
RST RSFSR 384-83
RST RSFSR 384-83
Straw of cereals, cereals, leguminous crops and herbs. Technical conditions
RST RSFSR 687-83
RST RSFSR 687-83
Cylinders. Repair and technical certification. Rules of repair and examination
RST RSFSR 690-83
RST RSFSR 690-83
Industry-Specific Product Quality Management System of Minmestprom RSFSR. Basic Principles
RST RSFSR 698-83
RST RSFSR 698-83
Ovens made of sheet steel. Technical conditions
RST RSFSR 703-83
RST RSFSR 703-83
System development and production of products. Products of folk arts and crafts
RST RSFSR 705-83
RST RSFSR 705-83
Krasnika fresh. Technical conditions
RST RSFSR 708-83
RST RSFSR 708-83
Product Quality Rating System. Machinery and Equipment for Road and Highway Maintenance. Index of Properties
RST RSFSR 92-83
RST RSFSR 92-83
Musical wind instruments. General technical conditions
Standard project 801-6-5.83
Standard project 801-6-5.83
Alb.1 Technological drawings. Architectural and construction solutions. Internal water supply and sewerage. Heating and ventilation. Electrical drawings. Automation of sanitary installations. Communications and signaling.
Standard project 801-6-5.83
Standard project 801-6-5.83
Fodder preparation shop for milk production complexes and farms for 800 and 1200 cows (brick walls). Album 2 Building products
Standard project 801-6-5.83
Standard project 801-6-5.83
Fodder preparation shop for milk production complexes and farms for 800 and 1200 cows (brick walls). Tab. 3 Equipment specification
Standard project 801-6-5.83
Standard project 801-6-5.83
Fodder preparation shop for milk production complexes and farms for 800 and 1200 cows (brick walls). Tab. 4 Statements of material requirements
Standard project 801-6-5.83
Standard project 801-6-5.83
Fodder preparation shop for milk production complexes and farms for 800 and 1200 cows (brick walls). Alphabet 5 Estimates
Standard project 801-6-5.83
Standard project 801-6-5.83
Fodder preparation shop for milk production complexes and farms for 800 and 12000 cows (on KORK-15-1 equipment set)
STP II-010-83
STP II-010-83
Comprehensive system to increase production efficiency. Management of scientific and technological progress and quality. Registration of design estimates at the stage of the RP. General provisions
STP II-016-83
STP II-016-83
Comprehensive system to increase production efficiency. Management of scientific and technological progress and quality. Acquisition, reproduction and coordination of design and estimate documentation. Execution order
TNR 34-00-002-83
TNR 34-00-002-83
Standard consumption rates of power pillars and special reinforced concrete for repair of OHL and MTP 0.4-20 kV
UO 38.011.85-83
UO 38.011.85-83
General specifications for the repair of shell and tube heat exchangers
VMR 2927-83
VMR 2927-83
Temporary guidelines for the consumption of chemicals for basic sanitary and hygienic research by sanitary and epidemiological stations
VMU 2685-83
VMU 2685-83
Temporary guidelines for the study of sanitary conditions for water use and the life of the population during the territorial redistribution of river flow
VMU 2779-83
VMU 2779-83
Temporary guidelines for the chromatographic measurement of daconil concentrations in workplace air
VMU 2780-83
VMU 2780-83
Temporary guidelines for chromatographic and gas chromatographic measurement of tomilon concentrations in the air of the working area
VMU 2781-83
VMU 2781-83
Temporary guidelines for the chromatographic measurement of stomp concentrations in the air of the working area
VMU 2782-83
VMU 2782-83
Temporary guidelines for the chromatographic measurement of feca-tribuphone concentrations in the air of the working area

All Codes and Regulations

All Categories

Send us a message Expand Collapse

Leave your message in the form below, and we will write back by e-mail!