Other norms

RST RSFSR 768-90
RST RSFSR 768-90
Woven wool blend (mixed) technical press for high-speed paper machines. Technical conditions
RST RSFSR 769-90
RST RSFSR 769-90
Technical drying cloth for papermaking and cardboard machines. Technical conditions
RST RSFSR 770-90
RST RSFSR 770-90
Cotton technical fabrics. Belting Technical conditions
RST RSFSR 771-90
RST RSFSR 771-90
Steel welded barrels and sunset repaired. Technical conditions
RST RSFSR 772-90
RST RSFSR 772-90
Cotton fabrics and mixed packaging harsh. Technical conditions
RST RSFSR 773-90
RST RSFSR 773-90
Knitted braid. General technical conditions
RST RSFSR 774-90
RST RSFSR 774-90
Hats and felt caps. Acceptance Rules and Test Methods
RST RSFSR 775-90
RST RSFSR 775-90
Pastures cultural for dairy cattle. Creation and use. Typical process
RST RSFSR 776-90
RST RSFSR 776-90
Technical meter wool blend fabrics. Technical conditions
RST RSFSR 777-90
RST RSFSR 777-90
Hollow sewing cloths. General technical conditions
R-TH-02-90
R-TH-02-90
Recommendations for cleaning chemical and petrochemical enterprises
RTs-AP33.90
RTs-AP33.90
Initial Maintenance
STK 3-19-90
STK 3-19-90
Installation of devices inside shields according to OST 36.13-90
STM 4-12-90
STM 4-12-90
Devices and auxiliary devices. Installation methods on the facades of shields and consoles. Temperature meters and controllers
STM 4-18-90
STM 4-18-90
Devices and auxiliary devices. Installation methods on the facades of boards and consoles. Signaling and control equipment. Part 1
STM 4-8-90
STM 4-8-90
Mechanisms executive electric. Floor and wall installation
STP 006-90
STP 006-90
About official travel
SZK 4-3-90
SZK 4-3-90
Instruments for measuring and controlling flow. Installation in the pipeline. Part I. Counters
SZK 4-4-90
SZK 4-4-90
Instruments for measuring and regulating the level. Installation of embedded structures on tanks. Knots and details. Part II
Typical Design Materials 903-02-29.90
Typical Design Materials 903-02-29.90
Album I. Explanatory Note
Typical Design Materials 903-02-29.90
Typical Design Materials 903-02-29.90
Album II. General plan. Fuel oil supply. Reinforced concrete structures. External networks of water supply and sewerage. Cable lines. Electric lighting of the territory. Communication and alarm. Heating network
Typical Design Materials 903-02-29.90
Typical Design Materials 903-02-29.90
Album III. Hardware Specifications
Typical Design Materials 903-02-29.90
Typical Design Materials 903-02-29.90
Album IV. Material Requirements Sheets
Typical Design Materials 903-02-29.90
Typical Design Materials 903-02-29.90
Album V. Estimates
Typical Design Materials 903-02-29.90
Typical Design Materials 903-02-29.90
Album I. Explanatory Note
Typical Design Materials 903-02-29.90
Typical Design Materials 903-02-29.90
Album II. General plan. Fuel oil supply. Reinforced concrete structures. External networks of water supply and sewerage. Cable lines. Electric lighting of the territory. Communication and alarm. Heating network
Typical Design Materials 903-02-29.90
Typical Design Materials 903-02-29.90
Album III. Hardware Specifications
Typical Design Materials 903-02-29.90
Typical Design Materials 903-02-29.90
Album IV. Material Requirements Sheets
Typical Design Materials 903-02-29.90
Typical Design Materials 903-02-29.90
Album V. Estimates
VMU-20-90
VMU-20-90
Temporary guidelines for the development of technical specifications for the creation of automated process control systems
Price: $279.00
VNE 13-90
VNE 13-90
Standard instructions for the safe operation of ventilation systems at enterprises for the production of mineral fertilizers
VSP 5190-90
VSP 5190-90
Temporary sanitary regulations for the production of lithium chemical current sources of various electrochemical systems
Zone typical project 801-2-122.13.90
Zone typical project 801-2-122.13.90
Album I. Production technology. Architectural and construction solutions. Internal plumbing and sewage. Electric lighting and power electrical equipment
Zone typical project 801-2-122.13.90
Zone typical project 801-2-122.13.90
Album II. Nodes Construction products
Zone typical project 801-2-122.13.90
Zone typical project 801-2-122.13.90
Album III. Hardware Specification
Zone typical project 801-2-122.13.90
Zone typical project 801-2-122.13.90
Album IV. Material Requirements List
Zone typical project 801-2-122.13.90
Zone typical project 801-2-122.13.90
Album V. Estimates
Zone typical project 801-2-122.13.90
Zone typical project 801-2-122.13.90
Cowshed for 240 cows of meat with keeping in boxes on a deep litter

All Codes and Regulations

All Categories

Send us a message Expand Collapse

Leave your message in the form below, and we will write back by e-mail!