Other norms

Model project 903-1-237.87
Model project 903-1-237.87
Album 10. Part 2. Estimates
Model project 903-1-237.87
Model project 903-1-237.87
Album 11. Part 1. Statement of Material Requirements
Model project 903-1-237.87
Model project 903-1-237.87
Album 11. Part 2. Statement of Material Requirements
Model project A-II,III,IV-300-380.87
Model project A-II,III,IV-300-380.87
Album 1 Explanatory note (from T.P. A-II, III, IV-300-381.87)
Model project A-II,III,IV-300-380.87
Model project A-II,III,IV-300-380.87
Album 2 Architectural solutions. Reinforced concrete structures. Metal structures
Model project A-II,III,IV-300-380.87
Model project A-II,III,IV-300-380.87
Album 3 Building products
Model project A-II,III,IV-300-380.87
Model project A-II,III,IV-300-380.87
Album 4 Heating and ventilation. Compressed air. Internal water supply and sewerage. DES. Electrical part. Signaling and communication (from T.P. A-II, III, IV-300-381.87)
Model project A-II,III,IV-300-380.87
Model project A-II,III,IV-300-380.87
Album 5 Equipment specifications (from T.P. A-II, III, IV-300-381.87)
Model project A-II,III,IV-300-380.87
Model project A-II,III,IV-300-380.87
Album 6 Material Requirements Sheets
Model project A-II,III,IV-300-380.87
Model project A-II,III,IV-300-380.87
Album 7 Book 1 Estimates
Model project A-II,III,IV-300-380.87
Model project A-II,III,IV-300-380.87
Album 7 Book 2 Estimates
Model project A-II,III,IV-300-380.87
Model project A-II,III,IV-300-380.87
Free-standing, buried warehouse of inventory and equipment made of monolithic reinforced concrete (water-saturated soils)
Model project A-II,III,IV-300-381.87
Model project A-II,III,IV-300-381.87
Album 1 Explanatory note
Model project A-II,III,IV-300-381.87
Model project A-II,III,IV-300-381.87
Album 4 Heating and ventilation. Compressed air. Internal water supply and sewerage. DES. Electrical part. Signaling and communication
Model project A-II,III,IV-300-381.87
Model project A-II,III,IV-300-381.87
Album 5 Hardware Specifications
Model project A-II,III,IV-300-381.87
Model project A-II,III,IV-300-381.87
Freestanding underground warehouse for materials and equipment
NPLShU-87
NPLShU-87
Manual on navigation of vessels of the Ministry of the River Fleet of the RSFSR in ice and storm conditions
Price: $757.00
NR 34-70-118-87
NR 34-70-118-87
Standards for the design of thermal insulation for pipelines and equipment of thermal and nuclear power plants
NRB 76/87
NRB 76/87
Radiation safety standards
ORD 14.370-44-87
ORD 14.370-44-87
Guidelines for the design of oxygen facilities in metallurgical plants
OSP-72/87
OSP-72/87
Basic sanitary rules for working with radioactive substances and other sources of ionizing radiation
OTT 4.260-87
OTT 4.260-87
Installation of automation systems. Manufacturing jobs. Laying cables and wires. General technical requirements
P 4430-87
P 4430-87
List of chemicals that, when used for preventive purposes, use of milk or other equivalent food products is recommended.
PiN AE 5.10-87
PiN AE 5.10-87
Foundation Beds for Reactor Rooms of Nuclear Power Plants
RK 1101-87
RK 1101-87
Underground utilities collectors. Working drawings of products
RK 34-38-025-87
RK 34-38-025-87
Guide to Overhaul of Indicating Pressure Gauges for Precise Measurements Type MTI
RP 6.029-1-87
RP 6.029-1-87
Design Guide. Large collective television reception systems
Price: $375.00
RST RSFSR 131-87
RST RSFSR 131-87
Metal folding beds. Technical conditions
RST RSFSR 145-87
RST RSFSR 145-87
Scissors. General technical conditions
RST RSFSR 202-87
RST RSFSR 202-87
Metal sinks under the sink. General technical conditions
Price: $135.00
RST RSFSR 253-87
RST RSFSR 253-87
Food mustard ready. Technical conditions
RST RSFSR 274-87
RST RSFSR 274-87
Makeup liquid. Technical conditions
RST RSFSR 297-87
RST RSFSR 297-87
Mastic theatrical. Technical conditions
RST RSFSR 315-87
RST RSFSR 315-87
Glue for make-up. Technical conditions
RST RSFSR 38-87
RST RSFSR 38-87
Paper wire clips. Technical conditions
RST RSFSR 434-87
RST RSFSR 434-87
Consumer services. Sewing, knitwear and hats. Marking, packaging, storage and transportation
RST RSFSR 552-87
RST RSFSR 552-87
Harps. General technical conditions
RST RSFSR 557-87
RST RSFSR 557-87
Hand-made carpets and rugs. Methods for determining the complexity categories of technical drawings
RST RSFSR 739-87
RST RSFSR 739-87
Seed potatoes. Storage under conditions of active ventilation. Typical process
RST RSFSR 740-87
RST RSFSR 740-87
Potatoes. Planting care in the ridge cultivation technology. Typical process
R-TH-01-87
R-TH-01-87
Design Guidelines for Compressors for Compressing Explosive Gases
RTP 37-87
RTP 37-87
Technological design guidelines for the repair and maintenance of agricultural equipment
RTS-17-87
RTS-17-87
Guidelines for welding dissimilar steels in the repair of ^/х and refinery equipment
SNiP 1.02.07-87
SNiP 1.02.07-87
Engineering Research for Construction
Price: $2,290.00
ST SEV 6084-87
ST SEV 6084-87
Modular dimensional coordination in construction. Fundamentals (not valid)
Standard project 705-4-96.87
Standard project 705-4-96.87
Albom 1 Part 1 General explanatory note. Technological part.
Standard project 705-4-96.87
Standard project 705-4-96.87
Appendix 2 Drawings of non-standardized equipment
Standard project 705-4-96.87
Standard project 705-4-96.87
Album 3 Architectural and construction solutions. Metal structures

All Codes and Regulations

All Categories

Send us a message Expand Collapse

Leave your message in the form below, and we will write back by e-mail!