Other norms

ST TsKBA 101-2011
ST TsKBA 101-2011
Pipe fittings. Disc connection unit with safety valve disc holder. Design, dimensions and specifications
ST TsKBA 102-2011
ST TsKBA 102-2011
Pipe fittings. Rubber seals for closures. Design, dimensions, manufacturing technology
ST TsKBA 103-2011
ST TsKBA 103-2011
Pipe fittings. Passivation of workpieces, castings, components and parts from corrosion-resistant steels and alloys
ST TsKBA 104-2011
ST TsKBA 104-2011
Pipe fittings. Adhesives and sealants. Stamps Basic parameters and conditions of use
ST TsKBA 106-2011
ST TsKBA 106-2011
Pipe fittings. Oxidation of titanium alloy parts
ST TsKBA 107-2011
ST TsKBA 107-2011
Pipe fittings. Sliding bearings made of composite materials. Design, dimensions and specifications
Standard project 901-4-11
Standard project 901-4-11
Water tank with a capacity of 250 cubic meters of reinforced concrete monolithic cylindrical. Alb.1 Construction part and equipment (for sites without groundwater)
Standard project 901-4-11
Standard project 901-4-11
Water tank with a capacity of 250 cubic meters of reinforced concrete monolithic cylindrical. Alb. 2 Construction part and equipment (for sites with groundwater)
Standard project 904-02-11
Standard project 904-02-11
Issue 1. Two-stage uncompressed air conditioning system (AAC). Fresh air supply The evaporative air conditioner (EAC) is mounted at the elevation above the supply air conditioner (PC)
Standard project 904-02-11
Standard project 904-02-11
Issue 2. Two-stage uncompressed air conditioning system (UAC) using recirculated air. Evaporative air conditioner (EAC) installed at the elevation above the supply air conditioner (PC)
Standard project 904-02-11
Standard project 904-02-11
Issue 3. Two-stage uncompressed air conditioning system (UACS). Supply air scheme. Two supply air conditioners (PC) installed at the elevation above one evaporative air conditioner
Standard project 904-02-11
Standard project 904-02-11
Issue 4. Two-stage uncompressed air conditioning system (UAC) using recirculated air. Two supply air conditioners (PACs) installed at the elevation above one evaporative air conditioner
ST-PO-SRP KAO: OB-3/2011
ST-PO-SRP KAO: OB-3/2011
Evaluation of intellectual property and intangible assets of a business
ST-PO-SRP KAO: OU-1/2011
ST-PO-SRP KAO: OU-1/2011
Estimate of the amount of damage caused to the vehicle
ST-PO-SRP KAO: PO-1/2011
ST-PO-SRP KAO: PO-1/2011
Valuation for secured loans in the form of collateral
TR 217-2011
TR 217-2011
Technical recommendations on the technology of waterproofing works using the materials of the "Antihydron" complex during the construction of underground parts of buildings and structures
Price: $274.23
TsSh-530-11
TsSh-530-11
Instructions for ensuring the safety of train traffic during technical operation of signaling systems and signaling systems
Price: $1,556.00
TTK K-6-6-11
TTK K-6-6-11
Clearing clearings from logging residues of overhead lines
VSP of 10.02.2011 # 10
VSP of 10.02.2011 # 10
Veterinary and sanitary rules for ensuring veterinary and sanitary safety for feed and feed additives
VSP of 17.03.2011 # 16
VSP of 17.03.2011 # 16
Veterinary and sanitary rules for the use, implementation, storage and production of veterinary drugs in the Republic of Belarus

All Codes and Regulations

All Categories

Send us a message Expand Collapse

Leave your message in the form below, and we will write back by e-mail!