Other norms

1986

Model project 801-4-105.86
Model project 801-4-105.86
Album 4. Statement of Material Requirements
Model project 801-4-105.86
Model project 801-4-105.86
Building for 250 heads of young cattle of tethered content (walls - brick pillars with log tidying, floors - wooden)
Model project 816-1-75.86
Model project 816-1-75.86
Album 1. General explanatory note. Production technology. Architectural solutions. Reinforced concrete structures. Metal structures. Internal water supply and sewerage. Heating and ventilation. Power equipment. Heating and ventilation automation. Communication and signaling
Model project 816-1-75.86
Model project 816-1-75.86
Album 2. Building products
Model project 816-1-75.86
Model project 816-1-75.86
Album 4. Hardware Specifications
Model project 816-1-75.86
Model project 816-1-75.86
Album 5. Non-standardized equipment (from TP 816-1-79.86)
Model project 816-1-75.86
Model project 816-1-75.86
Album 6. Material Requirements Sheets
Model project 816-1-75.86
Model project 816-1-75.86
Album 7. Estimates
Model project 902-5-24.86
Model project 902-5-24.86
Pump station for digesters with a volume of 2500 cubic meters. m
Model project 902-5-24.86
Model project 902-5-24.86
Album I. Technological, architectural, constructive, sanitary-technical solutions
Model project 902-5-24.86
Model project 902-5-24.86
Album II. Electrical solutions, automation, technological control. Assembly area drawings
Model project 902-5-24.86
Model project 902-5-24.86
Album III. The task to the manufacturer on the control and alarm panel - SCHUS
Model project 902-5-24.86
Model project 902-5-24.86
Album IV. Hardware Specifications
Model project 902-5-24.86
Model project 902-5-24.86
Album V. Statement of Material Requirements
Model project 902-5-24.86
Model project 902-5-24.86
Album VI. Estimates
Model project 902-5-24.86
Model project 902-5-24.86
Album I. Technological, architectural, constructive, sanitary-technical solutions
Model project 902-5-24.86
Model project 902-5-24.86
Album II. Electrical solutions, automation, technological control. Assembly area drawings
Model project 902-5-24.86
Model project 902-5-24.86
Album III. The task to the manufacturer on the control and alarm panel - SCHUS
Model project 902-5-24.86
Model project 902-5-24.86
Album IV. Hardware Specifications
Model project 902-5-24.86
Model project 902-5-24.86
Album V. Statement of Material Requirements
Model project 902-5-24.86
Model project 902-5-24.86
Album VI. Estimates
Model project 902-5-24.86
Model project 902-5-24.86
Pump station for digesters with a volume of 2500 cubic meters. m
Model project 902-5-25.86
Model project 902-5-25.86
Album I. Technological, architectural, constructive, sanitary-technical solutions
Model project 902-5-25.86
Model project 902-5-25.86
Album II. Electrical solutions, automation, technological control. Assembly area drawings
Model project 902-5-25.86
Model project 902-5-25.86
Album III. The task to the manufacturer on the control and alarm panel - SCHUS
Model project 902-5-25.86
Model project 902-5-25.86
Album IV. Hardware Specifications
Model project 902-5-25.86
Model project 902-5-25.86
Album V. Statement of Material Requirements
Model project 902-5-25.86
Model project 902-5-25.86
Album VI. Estimates
Model project 902-5-25.86
Model project 902-5-25.86
Pump station for digesters with a volume of 5000 cubic meters. m
Model project 902-5-25.86
Model project 902-5-25.86
Album I. Technological, architectural, constructive, sanitary-technical solutions
Model project 902-5-25.86
Model project 902-5-25.86
Album II. Electrical solutions, automation, technological control. Assembly area drawings
Model project 902-5-25.86
Model project 902-5-25.86
Album III. The task to the manufacturer on the control and alarm panel - SCHUS
Model project 902-5-25.86
Model project 902-5-25.86
Album IV. Hardware Specifications
Model project 902-5-25.86
Model project 902-5-25.86
Album V. Statement of Material Requirements
Model project 902-5-25.86
Model project 902-5-25.86
Album VI. Estimates
Model project 902-5-25.86
Model project 902-5-25.86
Pump station for digesters with a volume of 5000 cubic meters. m
Model project V-IV-225-43.86
Model project V-IV-225-43.86
Recessed auxiliary building
MT 34-70-027-86
MT 34-70-027-86
Method for calculating corrections to power, fresh steam consumption and specific heat consumption for the deviation of parameters and conditions from the nominal values for turbine units with adjustable steam extraction
MT 7010000006-86
MT 7010000006-86
Typical test method for stationary steam boilers
NBZhS RF-86
NBZhS RF-86
Manual on damage control of vessels of Ministry of River Fleet of the RSFSR
Price: $805.00
NGSM GA-86
NGSM GA-86
Manual on the service of fuels and lubricants in the USSR GA
Norms 22-86
Norms 22-86
External noise immunity of fixed and mobile radio receivers of the decameter wave band. Valid values. Measurement methods (with change 1)
Price: $343.00
Norms 33-2.2.02-86
Norms 33-2.2.02-86
Irrigation systems using wastewater. Design standards
NR 34-00-112-86
NR 34-00-112-86
Standards for minimum allowable loads of 150-1200 MW power units
P 28-86
P 28-86
Recommendations for the calculation of the length of the open water in downstream HPPs
P-2-100-336.86
P-2-100-336.86
Warehouse heated materials and equipment (freestanding)
P-2-50-334.86
P-2-50-334.86
Album I. Explanatory Note
PDK 4089-86
PDK 4089-86
Maximum Permissible Concentrations of Heavy Metals and Arsenic in Food Raw Materials and Food Products

All Codes and Regulations

All Categories

Send us a message Expand Collapse